9  Installation record 

 

The installation has been completed according to DIN and the technical rules in force. In addition, the customer has received 
instruction concerning the operation and maintenance. 
 

 

 

 

Place………………………………………………..   

 

 

 

Date………………………………………………………… 

 
 
Customer  

 

 

                               

 

 

 

 

Installer   

 

 

 

 

 

 

 

 

 

 

 
……………………………………………………. 

 

 

 

 

………………………………………………………………. 

Signature  

 

 

 

 

                  

 

 

 

 

 Signature 

 
 
 
Place of installation: 

……………………………………………………………………………………………………………………… 

 
 
Name: 

 

 

        

……………………………………………………………………………………………………………………... 

 
 
ZIP Code/Place: 

 

…………………………………………………..…………………………………………………………………. 

 
 
Street: 

 

 

        

……………………………………………………………………...……………………………………………… 

 
 
Phone: 

 

 

        

……………………………………………………………………………...……………………………………... 

 
 
Tank model:   

        

……………………………….   

 

 

   

Serial number …………….………………..……………… 

 
 
Date of invoice                ………………………………………………………...………………………………………………………….. 
 
 

Anode maintenance record 

 

Date 

Visual examination of 

anode 

Exchange of 

anode 

Sig stamp of installer 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
In the case of reclamation, the receipts for maintenance must be provided as proof. Please complete the data sheet, including 
the reason for reclamation, and submit to Wikora. 
 
Submitting the maintenance record does not ensure any promise of guarantee or claim. 

 

 

 

Summary of Contents for WPKR 1000

Page 1: ...maintenance record must be entirely completed and the user has to be instructed accordingly Efficient operation can only be guaranteed if the instructions of this manual are followed Warranty does not...

Page 2: ...must be at least as big as the safety valve outlet in width It may not have more than 2 bends and should not be longer than 2 m If for any compelling reasons 3 bends or a length up to 4 m are require...

Page 3: ...000 850 1050 1990 1590 280 1150 865 280 580 1590 280 1350 950 1950 1530 1195 280 Chart 1 W Tilting dimension Connections Type WPKR 750 WPKR 1000 Cold water hot water 1 2 Ga Circulation 3 Ga Aux boiler...

Page 4: ...95 160 Max working pressure buffer DHW heat exchanger bar 3 10 10 3 10 10 Capacity of heat exchanger litre 23 25 Heating area DHW tank m 2 0 2 0 Surface of heat exchanger m 2 7 3 0 Flow rate of heat e...

Page 5: ...re limiter is required and must be installed on site at the hot water outlet in order to prevent scalding Safety valve Drain pipe Safety group according to DIN 1988 Stop valve Stop valve Manometer con...

Page 6: ...nnect any electrical devices from the appliance Then carefully remove the insulation of the flange cover and unscrew the flange cover Limescale and rough residues can be crushed by a wooden bar Only u...

Page 7: ...Wikora GmbH Page 7 As of 6 22 2015 Errors excepted 8 Warranties and guarantee...

Page 8: ...ed through the installation of externally supplied parts or through irregular professional maintenance Subject to our general terms and conditions Legal warranty 2 years Guarantee years Conditions WBO...

Page 9: ...er Signature Signature Place of installation Name ZIP Code Place Street Phone Tank model Serial number Date of invoice Anode maintenance record Date Visual examination of anode Exchange of anode Signa...

Reviews: