1  General 

Depending  on the type and design, WIKORA tanks are suitable for heating and / or storing DHW and / or heating water. The 
heating  is  achieved  indirectly  via  heat  generators,  if  applicable,  from  different  heat  sources.  The  maximum  working  pressure 
and working temperature can be found in the technical data.  
 
Set-up, installation and commissioning must be undertaken by a qualified specialist, who must observe these instructions.  
 

The  site  of  installation  must  be  frost-protected  according  to  DIN  4753  and  should  be  in  direct  proximity  to  the  heat 
generator.  
 

When setting-up and installing the tank, the following regulations should be considered:  
In addition to the technical rules in force DIN  1988, DIN 18160, DIN 4753, DIN 4109, DIN 4708, DIN 4751 section 2-4 energy 
conservation law and VDE regulations are to be observed. Moreover, the relevant regulations of the suppliers as well as legal 
building regulations are to be considered.  
 

DHW requirements: 

  Minimum hardness:  

- 2° dh (sum of alkaline earths 0,4 mmol/l) 

  Conductivity 

- if external current anode is used 

≥ 100 µs/cm 

- if Mg-anode is used 130 µs/cm 

– 1500 µs/cm 

  pH-value according to Drinking Water Ordinance (6,5-9,5) 

 

Important: 

The exhaust pipe must be at least as big as the safety valve outlet in width. It may not have more than 2 bends and 

should not be longer than 2 m. If for any compelling reasons 3 bends or a length up to 4 m are required, then the entire exhaust 
line must be designed one nominal size larger. More than 3 bends, or a length exceeding 4 m is prohibited. The exhaust pipe 
must be installed with downward gradient. The drain line behind the funnel must feature at least the double width of the valve 
entrance. A sign is to be attached close to the exhaust pipe of the safety valve or on the safety valve itself.  „For safety reasons 
water  may  leak  from  the  exhaust  pipe  during  the  heating  process!  Do  not  lock!  "The  operability  of  the  safety  valve  is  to  be 
checked at regular intervals by means of de-ventilation.

  

 

2  Transport and installation 

In order to prevent damage during transport, the packaging should only be removed at the site of installation. During shipment, 
it should be ensured that the tank does not come in contact with any spiky or sharp items, nor is damaged through dropping or 
knocks.  
During  installation,  the  tank  must  be  disconnected  from  any  humidity  carrying  components.    Moreover,  sufficient  space  for 
maintenance and cleaning purposes should be kept free in front of, beside, above and behind the tank. 

 

Please  note  that  the  insulation  provided  should  be  kept  in  a  dry  place  at  least  24 hours at a minimum temperature of 
20°C before installation. 

 

 

 

 
 

Summary of Contents for WPKR 1000

Page 1: ...maintenance record must be entirely completed and the user has to be instructed accordingly Efficient operation can only be guaranteed if the instructions of this manual are followed Warranty does not...

Page 2: ...must be at least as big as the safety valve outlet in width It may not have more than 2 bends and should not be longer than 2 m If for any compelling reasons 3 bends or a length up to 4 m are require...

Page 3: ...000 850 1050 1990 1590 280 1150 865 280 580 1590 280 1350 950 1950 1530 1195 280 Chart 1 W Tilting dimension Connections Type WPKR 750 WPKR 1000 Cold water hot water 1 2 Ga Circulation 3 Ga Aux boiler...

Page 4: ...95 160 Max working pressure buffer DHW heat exchanger bar 3 10 10 3 10 10 Capacity of heat exchanger litre 23 25 Heating area DHW tank m 2 0 2 0 Surface of heat exchanger m 2 7 3 0 Flow rate of heat e...

Page 5: ...re limiter is required and must be installed on site at the hot water outlet in order to prevent scalding Safety valve Drain pipe Safety group according to DIN 1988 Stop valve Stop valve Manometer con...

Page 6: ...nnect any electrical devices from the appliance Then carefully remove the insulation of the flange cover and unscrew the flange cover Limescale and rough residues can be crushed by a wooden bar Only u...

Page 7: ...Wikora GmbH Page 7 As of 6 22 2015 Errors excepted 8 Warranties and guarantee...

Page 8: ...ed through the installation of externally supplied parts or through irregular professional maintenance Subject to our general terms and conditions Legal warranty 2 years Guarantee years Conditions WBO...

Page 9: ...er Signature Signature Place of installation Name ZIP Code Place Street Phone Tank model Serial number Date of invoice Anode maintenance record Date Visual examination of anode Exchange of anode Signa...

Reviews: