background image

© Wikora GmbH 

Page 4  

      As of 8/25/2015 

 

 

      Errors excepted. 

4  Technical data 

 

Description 

WKS 

155 

WKS  

205 

WKS  

305 

WKS  

405 

WKS  

505 

WKS  

805 

WKS  

1005 

WKS  

1505 

WKS  

2005 

WKS  

3005 

Storage volume (real) acc. 
to DIN EN 12897 

 [litre] 

153 

201 

300 

431 

500 

830 

983 

1535 

2010 

3035 

Max. working temperature    [°C] 

50 

50 

50 

50 

50 

50 

50 

50 

50 

50 

Min. working temperature    [°C] 

Max. working pressure 

 [bar] 

10 

10 

10 

10 

10 

10 

10 

Max. rel. humidity 

 [%] 

70 

70 

70 

70 

70 

70 

70 

70 

70 

70 

Max. env. temperature 

 [°C] 

24 

24 

24 

24 

24 

24 

24 

24 

24 

24 

Weight (empty) 

 [kg] 

95 

100 

103 

122 

151 

206 

234 

273 

359 

431 

 

 

 

 

 

 

 

 

 

                                                                     

Chart 3 

 

5  Installation 

All pipes connecting to the tank should have removable connections (fitting/flange). Pipe thread seals with teflon are to 
be avoided. 
 

All tank connecting pipes are to be planned, constructed and tested according to the technical rules in force, as well as to the 
corresponding norms and regulations in accordance with their application and supply medium. 
 
Sensors  and  thermostats  necessary  for  temperature  control  must  be  securely  and  permanently  positioned  on  the  tank 
(immersion sleeve and sensor rail). 
 
T

he tank’s venting and draining facilities must have the appropriate dimensions and be correctly installed. 

The installation company is responsible for the correct execution of work and for the safe and careful insulation of the pipes. 
 

All factory-made, non-insulated surfaces must be insulated in a professional manner on site. 

 

6  Commissioning   

  Before  putting  into  operation,  the  entire  system  should  be  flushed  through.  Particles  in  the  system  compromise  the 

operating reliability.  

  Fill the heating system slowly with water and vent all the air. 

  Start-up the system. 

 

Before the handover of the system to the end user/owner, the plumbing contractor should ensure that the 
system is tested to full load, controls are set and that pipe work and connections are without leaks. 

Afterwards, 

the end user has to be instructed in the operation and handling of the tank, as well as the system. The instruction 
must to be documented in the installation and maintenance record. 

  Please note that the operation and lifetime of the system depend decisively on a regular maintenance.  

7  Maintenance and wear parts 

Regular maintenance increases the lifetime and operation reliability of the system.   
A damp cloth is sufficient to clean the outer parts. Please avoid using any abrasive or solvent cleaning. 

8  Recycling and disposal 

The  products  are  specified  and  manufactured  according  to  VDI  2243.  The  products  are  mechanically  separable  and  100% 
recyclable. Make sure that the components are disposed according to the relevant regulations.  

Reviews: