                 Status: Mai 2011 

 

                                                                                                                                                                  Errors excepted.         

 

2.4 Installation of the collectors and the flashings 
 

Mark  the  left  and  the  right  edge  of  the  collector  field  on  the  battens. 
Depending  on  the  distance  of  the  battens  an  auxiliary  batten  must  be 
installed to support the 

lower flashings.

 

 
 
 
 
 
 
 
 
 

 

Lower flashings incl. flexible gasket strip

 are installed from the left to the 

right  and  should  protrude  the  collector  field  on  both  sides  by  about  32-35 
cm.  The  lower  flashings  should  be  put  with  the  folded  edge  on  the  upper 
edge of the main batten.  
Position the hanger support brackets (distance between the hanger support 
brackets of ca. 80 cm) und pre-drill the lower flashing. 
Screw the hanger support brackets and the lower flashings to the batten (3 
wooden screws 5x35 mm). 
 
 
 
 
 
 

 

Install further 

lower flashings

 overlapping and as previously mentioned.    

 
 
 
 
 
 
 
 
 
 
 

 

Adjust  the 

flexible  gasket  strip

  by  hand  or  with  the  hammer  shaft  to  the 

tiles.  Depending  on  the  type  of  tiles,  adjust  the  tile  carefully  by  using  an 
angle grinder or a hammer.  
 
 
 
 
 
 
 
 
 
 

 

Lower  the  collectors  on  the  hanger  brackets  (Pos.  8),  center  them  and 
tighten the parallel compression fitting between the collectors.  
 
 
 
 
 
 

 

 

 

 

 

 

Summary of Contents for Wikosun 2020-Mi

Page 1: ...ations Factory warranty will only be covered if the installation instructions are followed Warranty does not cover any damages caused by non observance of this manual The correct functioning is only g...

Page 2: ...6 7 8 Collector 2020 Mi 2340 Ti Clamp and positioning clip U shape Parallel compression fitting 22mm Compression T fitting 22x22x1 2 collector flow hot Sensor pocket x 100mm with cable bushing Compres...

Page 3: ...flow hot 1 Sensor pocket x 160mm with cable bushing 1 ST AVS 1S Compression fittings 22 x 22 mm 2 Flexible tube kit ST ADF 1 Flexible stainless steel tube with Cu joints 22mm 2 Chart 2 Mounting acces...

Page 4: ...ctors must be sufficiently stable If the distance between the battens or the rafters is too big additional battens should be inserted Number of collectors 2 3 4 Width of collector field mm 2950 4075 5...

Page 5: ...ld be put with the folded edge on the upper edge of the main batten Position the hanger support brackets distance between the hanger support brackets of ca 80 cm und pre drill the lower flashing Screw...

Page 6: ...en the collectors and the upper and lower side of each collector and screw it on the batten with wooden screws 6x60 mm Pos 2 Before installing further flashings the collectors should be pressure teste...

Page 7: ...distance of the battens an auxiliary batten must be installed for the mounting of the upper flashing in order to support the center flashing Position the upper flashings over the side flashings Secure...

Page 8: ...f adhesive sealing strips and position sealing cover Press down sealing cover and strip into position Then secure strip with screw and fiber washer supplied and fold sealing strip over flashings Cover...

Page 9: ...ly purged Open the lower plug at the collector field to purge the system Subsequently the system is to be filled with a water antifreeze mixture Please refer to chapter 7 Antifreeze for it s preparati...

Page 10: ...length of 40 m and heat exchangers with a capacity of 16 l Number of collectors 2 3 4 5 6 7 8 9 10 External diameter of the connection pipe in mm Flow rate in l min Flow rate in l h Expansion vessel i...

Page 11: ...no need of changing the preset parameters Please do not change the preset parameters by yourself You will lose any warranty and guarantee claim If you do not conform to the preset parameters please le...

Page 12: ...led sole Color medium 1 uncolored brown black cloudy 2 uncolored brown black cloudy 3 uncolored brown black cloudy 4 uncolored brown black cloudy 5 uncolored brown black cloudy 6 uncolored brown black...

Page 13: ...It is not hazardous material in the sense of transport regulations Gaseous state Color Odor Boiling point Density pH value Viscosity Water solubility Specific humidity Responsiveness Flashpoint Explos...

Page 14: ...authority in charge Cleaning clean with liquid binding material sand kieselguhr acid binder or universal binder Recycle contaminated material separately Keep the concentrate in a cool and dry environ...

Page 15: ...writing within 10 days after receipt or hidden defects immediately after emerging In case of hidden defects it is only valid for the warranty exceeding the legal warranty period if the collectors are...

Page 16: ...k vent valve at collectors Primary pressure exp vessel C Type Cooling function from colour unchanged brown black cloudy Flow rate m System settings Controller setting Consumer 1 e g DHW Consumer 2 e g...

Page 17: ...llector fastening is stable User has been instructed Maintenance contract Operation of pumps checked Temperature sensores indicate realistic values Collector interior is not fogged Collector is clean...