43
WIKA operating instructions pressure transmitter, model IS-3
EN
14243628.02 10/2018 EN/DE
6. Commissioning, operation
Mounting of field case
1.
Unscrew the case cover and open the cable gland using a suitable open-ended spanner.
2. Slide the cable though the cable gland into the open case head.
3. Press down the corresponding plastic lever on the spring clip terminal, using a screwdriver, in order to open the
terminal contact.
Insert the prepared cable end into the opening and let the plastic lever go. The cable end is now clamped in the
spring clip terminal.
4. After connecting the individual wires, tighten the cable gland and screw down the case cover.
Case cover
Cable gland
Spring clip terminal