
7
Caution!
After each installation of the case, carefully check if both gaskets (the
blue one and the red one) of the stub pipe closely fit to the heater’s case.
7. Exchange the aerator (strainer) for the aerator supplied by the manufacturer.
8. Adjust it according to the instructions given in section 6 of the manual.
9. Remember to periodically clean sediment from the aerator (strainer).
Term block
L – phase wire
N – neutral
– protective earth
fig. 6