Whittier Wood Furniture 2225AST Assembly Instructions Manual Download Page 8

2225AST Ellison Cal-King Panel Storage Bed 

Assembly Instructions 

This assembly requires two people. 

2225AST 

— Page 8 — 07/18 

 
5. 

NOTE: When attaching the Footboard (B) to the Pedestal/Base assembly attach it at the end of 
the Base with the leveler behind the crosspiece. 
There are two options to attach the Footboard (B) to the Pedestal Assembly. Option a) Release 
the two drawers (D) at the end of the assembly as shown in Fig. 5a. Open the Drawers (D) until 
the back edge of the drawer is even with the front of the Pedestal. Reach under the attached 
deckboard from the backside of the pedestal and insert Bolts (ZD) and Washers (ZE) into the 
Footboard (B). Push the drawers closed. Option b) remove the two end drawers (D) completely. 
Insert the bolts and washers into the Footboard and reinstall the drawers. See Fig. 5b, 5c. 

 

Fig. 5c 

ZE 

ZD 

x 4 

x 4  

Fig. 5b 

ZE 

ZD 

Option 5b shown in illustration 

Fig. 5 

Drawer Release Lever 

Fig. 5a 

Headboard end of Base 
has leveler outside the 
crosspiece 

Summary of Contents for 2225AST

Page 1: ...known to the State of California to cause cancer For more information go to www p65warnings ca gov furniture DESIGN SUBJECT TO CHANGE WITHOUT NOTICE CUSTOMER SERVICE If you ever have questions about y...

Page 2: ...o replace a part refer to the following letter and part name 2227AST Ellison Cal King Panel Headboard Footboard Kit x1 Part Description Quantity A Headboard Assembly 1 B Footboard Assembly 1 J 8 x 7 8...

Page 3: ...embled 3 E Drawer Face attached 3 F Left Right Center Deckboard 1 G 20 Drawer Slides installed 3 sets H 6 x 3 4 Philtruss Screw inserted 18 I 6 x 1 2 Philtruss Screw inserted 18 J 8 x 7 8 Black Lo Pro...

Page 4: ...ion Quantity P Mitered End Support 1 Q Square End Support 2 R Left Support 1 S Right Support 1 T Cal King Trestle Rail 26 7 8 4 U 8 x 1 3 4 Pan Head Screw inserted 12 V 10 x 3 4 Pan Head Screw inserte...

Page 5: ...on Square End Support Q and Mitered End Support P as a guide attach to the Right Support S using the Hex Bolts ZC and Washers ZE from the Headboard Footboard Kit See Figures 1 and 1a 2 Attach the asse...

Page 6: ...assembly requires two people 2225AST Page 6 07 18 3 Place each pedestal on top of the base kit against the side of and between the locater blocks of the Base Kit See Figure 3 Fig 3 C Locater blocks Lo...

Page 7: ...s assembly requires two people 2225AST Page 7 07 18 4 Open the drawers and attach the pedestal to the base using Hex Bolts ZD and Washers ZE only finger tight See Figures 4 and 4a Fig 4 Fig 4a Notched...

Page 8: ...end of the assembly as shown in Fig 5a Open the Drawers D until the back edge of the drawer is even with the front of the Pedestal Reach under the attached deckboard from the backside of the pedestal...

Page 9: ...Instructions This assembly requires two people 2225AST Page 9 07 18 6 Attach the Headboard A with Hex Bolts ZD and Washers ZE using assembly option a or b from Step 5 See Figures 6 and 6a Fig 6 ZE ZD...

Page 10: ...10 07 18 7 Once the Headboard and Footboard are attached open all drawers and tighten Hex Bolts ZD and Washers ZE on the inside of the bed assembly 8 Adjust levelers ZA only if floor is uneven or if b...

Page 11: ...2225AST Page 11 07 18 9 Insert Cal King Trestle Rail Supports T See Figures 9 and 9a 10 Place the Left Right Center Deckboards F as shown in Figure 10 and secure with twenty four 8x1 1 4 Black Screws...

Reviews: