Installation Instructions
7. Locate the appropriate electric service line, and bring it down through the opening in the gas canopy.
Open the Junction Box.
8. Lead the electric service line into the junction box, and attach all appropriate conduit fittings:
10. Close and secure the junction box
9. Lead the electric service line into the junction box, attach all conduit/box fittings, and connect the
electric service line to the appropriate leads in the junction box.
11. Lift the luminaire assembly up into the gas canopy, tucking the lanyard into the gas canopy’s interior
space.
FLED-R
Double-Deck Gas Canopy
Installation Instructions
WHITEWAY LIGHTING, A Division of Hubbell Lighting Inc
1085 Johnson Drive, Buffalo Grove, IL 60089
800-544-4848 | www.
hubbelllighting.com
Secure the luminaire assembly to the Mounting Frame using the four 10-32 machine screws (with captive
tooth lock washers)