Page 18
13369-1-0203
I
nstalling Vent Components (Figure 28)
Begin the vent system installation by installing the first component,
90
°
elbow to the starting collars or straight pipe on the top of the
appliance, then the straight pipe length and then horizontal or
vertical termination kit.
NOTE: All outer connection joints must be sealed with
aluminum tape or silicone sealant rated above 300
°
F/149
°
C.
The inner flue joints do not require any sealant.
All vent system components lock into place by sliding the
concentric pipe section with four (4) equally spaced interior
beads onto the appliance collar or previously installed component
end with four (4) equally spaced indented sections. When the
internal beads of each starting outer pipe line up, rotate pipe
section clockwise 90
°
(approximately 3 inches). The vent pipe is
now locked together.
Continue adding components per the pre-planned vent system
configuration. Be certain that each succeeding vent component is
securely fitted and locked into the preceding component in the
vent system.
Figure 28
Venting Components
Simpson Dura-Vent
Part Number
Part Number
Description
DVS-30
DVS-36/DVS-42
SD-908B
SD-1208
6" Pipe Length
SD-907B
SD-1207
9" Pipe Length
SD-906B
SD-1206
12" Pipe Length
SD-904B
SD-1204
24" Pipe Length
SD-903B
SD-1203
36" Pipe Length
SD-902B
SD-1202
48" Pipe Length
SD-911B
SD-1211
Adjustable Pipe Length 11 - 14 5/8"
SD-985
SD-1284
Horizontal Square Termination Cap
SD-950
SD-1250
Vinyl Siding Standoff
SD-945B
SD-1245
45
°
Elbow
SD-990B
SD-1290
90
°
Elbow
SD-947
SD-1249
Wall Firestop
SD-963
SD-1263
Ceiling Firestop
SD-943
SD-1243
Roof Flashing - 0/12 to 6/12 Roof Pitch
SD-953
SD-1253
Storm Collar
SD-991
SD-1291
High Wind Vertical Top
SD-981
SD-1281
36" Snorkel
SD-982
SD-1282
14" Firestop Snorkel
SD-988
SD-1288
Wall Strap
VENT SYSTEM IDENTIFICATION