11
B
2.
Remove center screw
Remove center terminal block screw (B).
Connect remaining wires
4.
Place hooked ends of remaining direct wire cable wires
under outer terminal block screws (hooks facing right).
Squeeze hooked ends together and tighten screws. Finally,
reinsert tab of terminal block cover into slot of dryer rear
panel. Secure cover with hold-down screw. Now, go to Venting
Requirements.
B
C
Place hooked end of neutral wire (white or
center) (C) of direct wire cable under center terminal block
screw (B). Squeeze hooked end together. Tighten screw.
3.
Connect neutral wire
1.
Prepare to connect neutral
ground wire and neutral wire
A
E
B
Remove center terminal block screw (B). Remove neutral ground
wire (E) from external ground conductor screw (A).
E
B
C
Connect neutral ground wire (E) and neutral wire (white or
center wire) (C) of power supply cord or cable under center
terminal block screw (B). Tighten screw.
Connect remaining wires
3.
Place hooked ends of remaining wires under outer terminal
block screws (hooks facing right). Tighten screws.
Optional 3-wire Connection
IMPORTANT:
You must verify with a qualified electrician that
this grounding method is acceptable before connecting.
2.
Connect neutral ground wire
and neutral wire
Summary of Contents for WED5500BW
Page 2: ...2 DRYER SAFETY ...