6
INSTALLATION & USE
Note 1 : On stainless steel hoods, carefully remove the plastic protective film from all
exterior surfaces of the hood and chimney prior to final installation.
Note 2: At least two people will be required to mount the hood.
WALL DRILLING AND BRACKETS FIXING (X=Y-240)
1. Draw a vertical line on the supporting wall up to the ceiling, or as high as practical,
at the centre of the area in which the hood will be installed.
2. Draw a horizontal line at 700mm
above the hob.
3. Place one of chimney mounting
brackets 5.1 on the wall as shown
min. 20mm from the ceiling or
upper limit aligning the centre
(notch) with the vertical reference
line.
4. Mark the wall at the centre of the
holes in the bracket.
5. Place the hood mounting bracket 5.2 on the wall as shown aligning the central
notches to the vertical reference line.
6. Mark the wall at the centre of the holes in the bracket.
7. Drill
φ
10mm holes at all the centre points marked.
8. Fix the two brackets using the mounting screws and drywall anchors.
MOUNTING THE HOOD BODY
1. Hook
the
body
onto the hood mounting
bracket 5.2 as shown.
2. Balance the hood body by slightly
adjusting the hood mounting bracket.
Gently lower the hood until it securely
engages the bracket.