background image

10

INSTALLATION INSTRUCTIONS – GAS DRYER

Install Coin Slide and Coin Box

The console houses the factory-installed accumulator timer with
actuating arm and button. 

The factory-installed timer is set to provide 45 minutes (4 pins) of
drying time when activated by the coin slide. Timer cams for 
30-minute (6 pins) and 60-minute (3 pins) drying times are
included in the parts bag.

The coin slide mechanism, control panel lock and key, and coin
box lock and key are not included and are available from usual
industry sources.

NOTE:

Slide dryer onto cardboard or hardboard before moving to

avoid damaging floor covering.

1.

Using two or more people, move dryer to desired installation
location.

2.

Take tape off front corners of dryer. Open dryer and remove
the literature and parts packages. Wipe the interior of the
drum thoroughly with a damp cloth. 

3.

Take two of the cardboard corners from the carton and place
them on the floor in back of the dryer. Firmly grasp the body
of the dryer and gently lay it on its back on the cardboard
corners.

4.

With one of the legs in hand, check the ridges for a diamond
marking. That's how far the leg is supposed to go into the
hole.

5.

Start to screw the leveling legs into the holes by hand. (Use a
small amount of liquid detergent to lubricate the screw
threads so it is easier to turn the legs.) Use a 1-inch wrench or
socket wrench to finish turning the legs until you reach the
diamond mark.

Now stand the dryer up.

6.

Remove the service door of the meter case by lifting it up at
the back. Install the money-accepting device. (Refer to
manufacturer's instructions for proper installation.)

For dryers using coin slides, use the adapter kit supplied with
the dryer.

7.

Replace the meter case service door. Put the coin vault with
lock and key in the meter case opening.

8.

Remove cardboard or hardboard from under dryer.

WARNING

Excessive Weight Hazard

Use two or more people to move and install dryer.

Failure to do so can result in back or other injury.

Make Gas Connection

1.

Remove red cap from gas pipe.

2.

Connect gas supply to dryer. Use pipe-joint compound
resistant to the action of L.P. gas for gas connections. If
flexible metal tubing is used, be certain there are no kinks.

If necessary for service, open the toe panel. Use a putty knife
to press on the toe panel lock located at the center top of the
toe panel. Pull downward on the toe panel to open. Toe panel
is hinged at the bottom.

3.

Open the shutoff valve in the gas supply line. 

4.

Test all connections by brushing on an approved noncorrosive
leak-detection solution. Bubbles will show a leak. Correct any
leak found.

Connect Vent

1.

Using a 4" (10.2 cm) clamp, connect vent to exhaust outlet in
dryer. If connecting to existing vent, make sure the vent is
clean. The dryer vent must fit over the dryer exhaust outlet
and inside the exhaust hood. Make sure the vent is secured to
exhaust hood with a 4" (10.2 cm) clamp.

2.

Move dryer into final position. Do not crush or kink vent. Make
sure dryer is level.

3.

Check to be sure there are no kinks in the flexible gas line.

Complete Installation

1.

With dryer in final position place level on top of the dryer, first
side to side; then front to back. If the dryer is not level, adjust
the legs of the dryer up or down until the dryer is level.

2.

Plug into a grounded 3 prong outlet.

3.

Check dryer operation (some accumulated time may be on
the timer due to factory testing). 

Insert coins in slide and press slide in slowly. (Operating time
will accumulate per number of coins and type of timing cam
used.) Push START/RESTART button. Using a full heat cycle

Electrical Shock Hazard

Plug into a grounded 3 prong outlet.

Do not remove ground prong.

Do not use an adapter.

Do not use an extension cord.

Failure to follow these instructions can result in death, 
fire, or electrical shock.

WARNING

Summary of Contents for 8TCEM2760KQ0

Page 1: ...INSTALLATION INSTRUCTIONS COMMERCIAL DRYER Gas or Electric Table of Contents 2 W10103110 ...

Page 2: ...instructions DANGER WARNING TABLE OF CONTENTS DRYER SAFETY 2 INSTALLATION REQUIREMENTS 4 Tools and Parts 4 Location Requirements 4 Electrical Requirements 6 Gas Supply Requirements 7 Venting Requirements 8 INSTALLATION INSTRUCTIONS GAS DRYER 10 Install Coin Slide and Coin Box 10 Make Gas Connection 10 Connect Vent 10 Complete Installation 10 INSTALLATION INSTRUCTIONS ELECTRIC DRYER 11 Install Coin...

Page 3: ...re electric shock or injury to persons when using the dryer follow basic precautions including the following WARNING Read all instructions before using the dryer Do not place items exposed to cooking oils in your dryer Items contaminated with cooking oils may contribute to a chemical reaction that could cause a load to catch fire Do not dry articles that have been previously cleaned in washed in s...

Page 4: ...ered for ease of installation servicing and compliance with local codes and ordinances If closet door is installed the minimum unobstructed air opening in the top and bottom is required Louvered doors with equivalent air openings are acceptable The dryer must be exhausted outdoors No other fuel burning appliance may be installed in the same closet as the dryer WARNING Explosion Hazard Keep flammab...

Page 5: ...nal exhaust elbow is used closet door Front View 3 7 6 cm 3 7 6 cm 24 in2 155 cm2 48 in2 310 cm2 Opening is the minimum for a closet door Louvered doors with equivalent air openings are acceptable 0 0 cm Closet door 14 35 6 cm max 1 2 5 cm 0 0 cm 15 38 1 cm 0 0 cm Product Dimensions 27 68 6 cm dryer 27 68 6 cm 37 94 cm 14 35 6 cm ELECTRIC GAS EXHAUST LEFT OR RIGHT SIDE EXHAUST 4 12 1 cm 13 33 cm 1...

Page 6: ... a qualified electrical installer determine that the ground path is adequate A copy of the above code standards can be obtained from National Fire Protection Association One Batterymarch Park Quincy MA 02269 A four wire or three wire single phase 120 240 volt 60 Hz AC only electrical supply or four wire or three wire 120 208 volt if specified on the model serial rating plate is required on a separ...

Page 7: ...tall a shut off valve Securely tighten all gas connections If connected to LP have a qualified person make sure gas pressure does not exceed 14 36 cm water column Examples of a qualified person include licensed heating personnel authorized gas company personnel and authorized service personnel Failure to do so can result in death explosion or fire GROUNDING INSTRUCTIONS SAVE THESE INSTRUCTIONS For...

Page 8: ...ound or any object that may be in the path of the exhaust such as flowers rocks or bushes WARNING Fire Hazard Use a heavy metal vent Do not use a plastic vent Do not use a metal foil vent Failure to follow these instructions can result in death or fire Flexible metal appliance connector It is recommended that a new flexible stainless steel gas line design certified by CSA International be used for...

Page 9: ...ny plastic or metal foil vent with rigid metal or flexible metal vent Plan installation to use the fewest number of elbows and turns Allow as much room as possible when using elbows or making turns Bend vent gradually to avoid kinking Vent outlet is located at the center of the bottom dryer back The vent can be routed up down left right behind the dryer or straight out the back of the dryer Vent S...

Page 10: ...ove cardboard or hardboard from under dryer WARNING Excessive Weight Hazard Use two or more people to move and install dryer Failure to do so can result in back or other injury Make Gas Connection 1 Remove red cap from gas pipe 2 Connect gas supply to dryer Use pipe joint compound resistant to the action of L P gas for gas connections If flexible metal tubing is used be certain there are no kinks ...

Page 11: ...nstallation For dryers using coin slides use the adapter kit supplied with the dryer WARNING Excessive Weight Hazard Use two or more people to move and install dryer Failure to do so can result in back or other injury 7 Replace the meter case service door Put the coin vault with lock and key in the meter case opening 8 Remove cardboard or hardboard from under dryer Make Electrical Connection Power...

Page 12: ...tral wire white or center of the power supply cord under the center screw of the terminal block Tighten screw 9 Connect the other wires to outer terminal block screws Tighten screws 10 Tighten strain relief screws 11 Insert tab of the terminal block cover into slot of the dryer rear panel Secure cover with hold down screw Four wire power supply cord must have four No 10 copper wires and match a fo...

Page 13: ...r terminal block screws Tighten screws 8 Tighten strain relief screws 9 Insert tab of the terminal block cover into slot of the dryer rear panel Secure cover with hold down screw D A C B 5 Remove the center terminal block screw 6 Remove the appliance neutral ground wire from the external ground conductor screw Connect the appliance neutral ground wire and the neutral wire white or center of the po...

Page 14: ...l block cover D Hold down screw A to disconnect box B D 5 12 7 cm 1 2 5 cm of wires stripped of insulation C Strip 5 12 7 cm of outer covering from end of cable Leave green or bare ground wire at 5 12 7 cm Cut 1 3 8 cm from 3 remaining wires Strip insulation back 1 2 5 cm Shape ends of wires into a hook C B A E D F 5 Remove the center terminal block screw 6 Remove the appliance neutral ground wire...

Page 15: ...re cut green or bare wire even with outer covering Three wire with ground wire green or bare wire cut short Wire is not used Dryer is grounded through neutral conductor to disconnect box 1 2 5 cm of wires stripped of insulation 3 1 2 8 9 cm 5 Loosen or remove the center terminal block screw 6 Place the hooked end of the neutral wire white or center of the direct wire cable under the center screw o...

Page 16: ... the ratchet tooth 5 Place new cam hub side down over clock shaft Line up flat side of shaft with flat side of cam hole Check that drive lug is in place 6 Turn cam until V shaped notch lines up with ratchet tooth 7 Press cam down in place on motor shaft Make sure that V shaped notch clears the ratchet tooth 8 Close and lock the meter case CHANGING TO A 30 OR 60 MINUTE TIMING CAM B C D A A Ratchet ...

Page 17: ... fuse is not blown Door is closed Controls are set in a running or ON position START button has been pushed firmly For gas dryers check that gas supply shutoff valves are set in open position If you need assistance The Commercial Laundry Support Center will answer any questions about operating or maintaining your dryer not covered in the Installation Instructions The Commercial Laundry Support Cen...

Page 18: ...W10103110 Printed in U S A 2006 05 2006 ...

Page 19: ...2 W10103110 ...

Page 20: ...2 2 4 4 4 6 7 8 10 10 10 10 10 11 11 11 15 15 16 ...

Page 21: ...3 ...

Page 22: ...4 ...

Page 23: ... 9 cm 25 64 8 cm 18 46 7 cm 5 3 7 6 cm 3 7 6 cm 24 in2 155 cm2 48 in2 310 cm2 0 0 cm 14 35 6 cm 1 2 5 cm 0 0 cm 15 38 1 cm 0 0 cm 27 68 6 cm 37 94 cm 14 35 6 cm 4 12 1 cm 13 33 cm 1 3 2 cm 4 10 8 cm 6 15 2 cm 4 10 2 cm 1 2 5 cm 7 18 1 cm 7 20 cm 35 88 9 cm 26 67 3 cm 29 74 3 cm 14 35 9 cm 7 18 4 cm 10 26 cm ...

Page 24: ...6 ...

Page 25: ...7 ...

Page 26: ...8 A B C ...

Page 27: ...13 4 m 35 ft 10 7 m 27 ft 8 2 m 36 ft 11 0 m 31 ft 9 4 m 27 ft 8 2 m 25 ft 7 6 m 23 ft 7 0 m 0 1 2 3 4 0 1 2 3 4 58 ft 17 7 m 48 ft 14 6 m 38 ft 11 6 m 29 ft 8 8 m 21 ft 6 4 m 28 ft 8 5 m 23 ft 7 0 m 19 ft 5 8 m 17 ft 5 2 m 15 ft 4 6 m A B A E B G C D F C ...

Page 28: ...10 1 2 3 4 5 6 7 8 1 2 3 4 1 2 3 1 2 3 ...

Page 29: ...11 1 2 3 4 5 6 7 8 1 4 5 ...

Page 30: ...3 4 12 2 B C A 5 6 7 8 9 10 11 B D C G F E A C B A F G E D C D B A ...

Page 31: ...13 G F E B A E F D C E C D B A 5 6 7 8 9 D A C B 5 6 7 8 9 10 ...

Page 32: ...14 1 2 3 4 C D B A A B D 5 12 7 cm 3 8 9 cm C C B A E D F 5 6 7 8 9 10 B C A ...

Page 33: ...15 1 2 1 2 3 4 5 3 1 2 8 9 cm 5 6 7 8 5 6 7 8 9 A B C A B C D E F E D A C B ...

Page 34: ...16 1 2 3 4 5 6 7 8 B C D A ...

Page 35: ...17 ...

Page 36: ...W10103110 2006 05 2006 ...

Reviews: