Xcavator
Operating Instructions
3
Familiarization
Control Panel
Access Door
1. Ready indicator
2. 100 Gram cycle start key (cool mold)
3. 200 Gram cycle start key (cool mold)
4. 100 Gram time delay before start indicator (hot mold)
5. 200 Gram time delay before start indicator (hot mold)
6. Abort cycle key
7. Exhaust flow Indicator
8. Depth of cut selector switch
Setup
Air Supply
1. Connect your compressed air supply to the air regulator
inlet hole shown in the photograph (Figures 1A and 1B).
The inlet hole is a standard 1/8" National Pipe Thread (NPT).
Air Regulator
Setpoint Adjust
2. With air supply connected, pull knob upward, and
rotate it until gauge needle points to 35 psi (Figure 2).
nOTE: THIS MAy nEED TO BE RE-ADjuSTED SlIGHTly
OnCE BEAD FlOW IS ESTABlISHED.
Push knob back downward after pressure is set.
Daily Moisture Bowl Check
3. Pressing upwards on the black plastic ring at the bottom
of the air regulator opens up a check valve and allows
accumulated moisture to drain from the clear plastic
accumulator bowl (Figure 3). It is very important to keep
drained so that moisture does not pass through to the
bead reservoir. Moist beads will adhere to each other
and prevent transfer to the nozzle.
1
2
6
3
7
4
8
5
Figure 2
Figure 3
Figure 1A
Figure 1B
Summary of Contents for Xcavator
Page 16: ...MPL5300 12 08 ...