3. 

Pumping flow rate:
Pump speed settings

Prior to making adjustments 

turn the

shower on

and wait till the pump runs. 

Set the shower flow rate to 8 ltrs/min.

Watch the level of water within the shower
using the gulley cover as a guide. If the water
level is lowering then reduce the speed of the
pump by pressing the Down arrow. Use initial
increments of 5 until fine tuning is required.
When the water level is rising then increase
the speed of the pump by using the
Up arrow.

After making a change watch the water level.
Wait at least 30 seconds, as the system
needs to stabilise, until you see if the water is
rising or falling. When the water level is
slightly over pumping, program in the speed
setting by pressing the Mode button firmly
until the LED blinks

4. Pump speed – Narrow setting

This setting is required for higher flow rates.  

a.

'Pump speed' must be set first as per
above using a mid-range flow setting.

b.

Increase the flow from the shower in
increments of 2 litres and watch the
water level around the shower gulley. If
this is rising or falling over time make
adjustments until a constant level is
observed then programme in the
setting.

c.

This process is repeated in 2 ltr
increments. The narrow adjustment
corrects the flow rate over a band 1
ltr/min either side of the flow rate that is
being calibrated.

5. 

Pump shut down:-
Over Run (Auto Sense) preferred option

To set Auto Sense Over Run (indicated by
'AS' on the LED) you must turn off the
shower when you have selected this mode.
When the pump is drawing air there will be a
gurgling noise at the gulley, press down the
Mode button so the controller stores the
loading on the pump at this point.

Over Run (Fixed)

Alternatively to set a fixed Over Run delay
use the Up and Down arrows. Each digit
represents a delay of 5 seconds
(i.e. 2 =10 seconds over run).
Hold the Mode button down to program.

Commissioning Checklist

a.

All push fit fittings must have the twist
lock in the locked position.

b.

Check all plumbing for leaks.

c.

Check waste water plumbing for leaks
while pump is running.

d.

Ensure flow sensor is unstressed.

After programming all the settings, turn the
shower on and check for correct operation. 
Make final adjustment to the Start Delay if
required.

Note: 15 minutes after showering is finished, the
pump will switch on for a brief period in order to
remove any water that may have pooled.

14

Summary of Contents for SDP073R

Page 1: ...Dry Deck 20 Installation Instructions Model Number SDP073R Dry Deck 20 Installation guidelines for This booklet should be read before installation...

Page 2: ...eck 20 product Since 1995 Whale have been the leading manufacturer of pump kits for use with shower trays and wet floors These kits have the reputation of working reliably for many years without requi...

Page 3: ...formance after installation please contact your installer Installation User Warning 1 1 Pump Orientation 4 1 2 Rotation of Pump Head 4 1 3 Plumbing Pump Head 4 1 4 Waste Pipe Layout 5 1 5 Pump and Sur...

Page 4: ...eight of 500 mm Fix the pump in position through the feet with the screws and washers provided 1 2 Rotate the pump head if necessary to give a straight run of pipe to the waste Loosen the clamping rin...

Page 5: ...vertical lift on the inlet to the pump and the discharge from the pump is allowed When laying the pipe under the floor use only slow radius bends Use slow radius bends above the floor if possible to...

Page 6: ...d to secure When fitting in solid floors remove enough concrete for the installation of the waste water pipe and gulley Where copper pipe runs under the concrete it must be lined to protect it and pre...

Page 7: ...sistance The discharge from the pump must go into the top of the macerator box and not into lower side entries DO NOT USE the bottom entries It is preferable to have two separate discharge lines to wa...

Page 8: ...this device failure to do so will invalidate warranty 1 8 Location of Control Unit Locate the control unit outside the showering area as per BS7671 2001 in zone 2 or 3 refer to the drawing The control...

Page 9: ...9 Schematic of Dry Deck Components 1 11...

Page 10: ...ior to inserting into spring loaded contacts Push contact arm back with a finger or small screwdriver before inserting wire and then release Check for good connection using gentle tug on wire 1 Connec...

Page 11: ...1 decimal place Flow rates of 10 ltrs min and above will display the rate as the nearest whole number For example 3 4 ltrs min on inlet 1 LED show 3 4 7 5 ltrs min on inlet 2 LED shows 7 5 Then total...

Page 12: ...12 1 13 1 14...

Page 13: ...f the pump How to adjust Settings a Pressing the Mode button will switch between the various mode settings indicated by small LEDs b The Up and Down arrows are used to adjust the value c Press down th...

Page 14: ...ents until a constant level is observed then programme in the setting c This process is repeated in 2 ltr increments The narrow adjustment corrects the flow rate over a band 1 ltr min either side of t...

Page 15: ...speed If over pumping reduce pump speed When the system is slightly over pumping Press and hold the MODE Button firmly until green light flashes The pump will stop temporarily whilst the setting is s...

Page 16: ...The two outlet valves protect the pump against losing prime The aggressive flushing keeps the pump valves clear of debris resulting in a pump which does not require regular maintenance Unlike other pu...

Page 17: ...tive 73 23 EEC amended by 93 68 EEC on the harmonization of the laws of the Member States relating to electrical equipment designed for use within certain voltage limits CE mark affixed 03 06 05 Basis...

Page 18: ...tatus display mode will be exited if the keys are inactive for a period greater than 10 minutes same as configuration mode Status display will be exited if either the mode or decrement key is pressed...

Page 19: ...es Yes No What is the fault Pump does not pump properly Check flow rate of shower The pump is capable of 8 ltrs min on 15mm electric showers only or 12 ltrs min on 22mm mixer showers only If the flow...

Page 20: ...20 Control Unit 755 176 Pump SDS041T...

Page 21: ...21 Surge Damper 755 228 50mm Gulley 755 140...

Page 22: ...22 200 mm 155 mm 22 mm 16 mm 22 mm 13 mm 200 mm 22 mm 16 mm 38 mm 122 mm Vinyl Floor Gulley AK1610 90mm Gulley AK1695 Tiled Floor Gulley AK1615...

Page 23: ...23 Dry Deck Spares Pump Only SDS041T Flow Sensor SDS051T Diaphragm Service Kit SDS061T Pump Head Replacement SDS071T...

Page 24: ...ale Old Belfast Road Bangor BT19 1LT N Ireland Technical Helpline 0845 0694 253 whalepumps com dry deck whalepumps com tel 44 0 28 9127 0531 fax 44 0 28 9146 6421 Ref No 180 116 0607 v1 Contact Detail...