1.1
1.1
Before mounting the pump refer to the
plumbing diagram on page 6 for maximum
pipe runs. The pump is IP45 compliant and
may be installed in Zone 2 of the bathroom
(see page 10).
Mount the pump on a solid wall to prevent
vibration. Use a back board if this is not
possible.
The pump is mounted vertically, as shown,
within 3 m of the gulley.
To aid servicing the head of the pump must be
above the floor by at least 150 mm (maximum
height of 500 mm).
Remove the pump cover and place the pump
in the back plate and position where the pump
is to be fixed. Mark the pump mounting points
through the 4 slots in the back plate.
(See additional Quick Guide insert).
1.2
Rotate the pump head if necessary to give a
straight run of pipe to the waste. Loosen the
clamping ring on the pump head and rotate
the head before retightening clamping ring.
Note: Do not remove the pump head.
Using the screws and washers provided fix the
pump and backplate in position.
Clip the pump cover onto the backplate once
the pipework has been fitted.
5
Pump Installation
1.2
1.3