WD-ACS 47D
Rev. 1.0 (202003)
Installation instructions
16
3.8
Trial operation
Prepare the machine for trial operation with the help of OPERATING INSTRUC-
TIONS. The instructions describe the measures that must be taken to prepare the
machine for operation.
3.8.1
Commissioning protocol
This should be completed when the machine is started up and used.
Read the installation and user manuals carefully. Then check the following points:
1. Check:
•
Water, steam and drain connections
•
That the machine is evenly balanced
•
That closed doors are in line
•
Detergent and drying agent
•
That filters, level pipe, filter tray and partitions are in position
•
That mini-switches for all heating elements are in the OFF position
•
That the overheating protection on the booster heater and the tank element
is reset.
2. Filling the machine:
•
Close the doors
•
Switch on the main switch and turn the knob to 1
•
Fill the machine with water in accordance with the OPERATING INSTRUC-
TIONS
Note: It takes approximately 10 minutes to fill the system. The booster
heaters fill automatically when the doors are closed. The machine has a fill-
ing check function for the booster heaters. When the function is activated,
a check is carried out to ensure that the booster heaters are full of water,
before the element is switched on.
N.B.: If the filling process is interrupted using the control button, the check
starts again from the beginning.
•
When the filling check has been completed and all the tanks are full, the
mini-switches for the booster heaters switch on.
3. Start the machine: (see the OPERATING INSTRUCTIONS)
•
Check the overload switch
•
Check the direction of rotation of the pumps
NB! If the direction of rotation is wrong, the phase must be inverted on the
incoming feed.
Machine type:
Machine serial number:
Installation date: