P. 4
Decide exactly where you wish to install the bathtub. Clean, level and prepare the floor for
installation.
Bathtub installation - FREESTANDING
Models: BBE 01, BBE02, BC 0101, BC 0401, BC 0801, BC 0802, BC 0803, BC 1001, BC 1101,
BC 1201, BC 1401, BCL 01, BCLB 01, BCR 01, BOV 01-62, BOV 01-66, BOV 02, BOV 03,
BST 01, BTP 01, BWA 01, BLB 01, BLB 02 and BMD 01.
Place the unit in the exact installed position on the floor and trace the outline of the bath with
a pencil or any erasable marking.
Using a blanket, cardboard, or other clean protective surface, turn the unit on its side so that
the unit is properly supported during drain installation.
Clean the drain hole area in preparation of setting the drain. The area should be dry and free
of any debris. Apply a bead of clear silicone or plumber’s putty around the Drain Body and
pass it through the drain hole. Apply plumber’s putty to the Washer and slide it over the
bottom of the Drain Body.
Install the basic plumbing components: water inlet and floor drain. These tub models
require a
vertical plumbing connection
from the floor. A horizontal connection is only possible if the side
wall of the bathtub is pierced.
2
4
3
4
1
2
3
WETSTYLE Plug & Bathe
overflow and
drain connection system includes:
Soft-touch pop-up drain, for built-in
overflow. Fits both 1-3/4” tubular brass.
Washer.
1-1/2” ABS Direct vertical drain waste
fitting (copper/brass option also
available).
1-1/2” ABS 90º Elbow drain waste fitting
(copper/brass option also available).
TM
PUTTY
or
SILICONE
ABS
PIPE
GLUE
Installation guide
Montréal - Canada | 1-888-536-9001 | www.wetstyle.com | November 2019