Westward Heavy Duty Wheel Dolly
Operating Instructions & Parts Manual
5ML74A
Please read and save these instructions. Read carefully before attempting to assemble, install, operate or maintain the product described. Protect yourself
and others by observing all safety information. Failure to comply with instructions could result in personal injury and/or property damage! Retain instructions
for future reference.
®
Description
Westward heavy duty wheel dolly is designed to remove, transport and replace tire and
wheel assemblies on trucks, buses and trailers. It is a labor saving device useful in auto
shops, bus barns and fleet service. This wheel dolly is designed to meet applicable
ANSI/PALD Standards.
Specifications
Overall Size Rollers Lifting
Tilt
Model
Capacity
(L X W X H)
Distance Range
Degree
5ML74A 3/4 Ton 45-
1
/
8
”
X
39-
1
/
2
”
X
34
5
/
8
” 26” 2-
1
/
2
” ~ 8-
3
/
8
”
5°
(1500 Lbs)
Hydraulic Unit
Front Wheel
Chain
Figure 1 - Wheel Dolly Components
General Safety Information
Read and understand
all warnings and
instructional material provided on and with
this product. Do not exceed rated capacity.
Thoroughly familiarize yourself with this
product before use. Use only on smooth
hard, level surfaces capable of sustaining
the load. Before moving, lower the load to
the lowest possible point and assure that
the load is centered and secured with a
load restraint device. Apply load as close
to the vertical position of the lifting
member as possible. No alterations shall
be made to this product. Do not use this
device for any purpose other than that for
which it is intended. Failure to heed this
warning may result in severe, injury as
well as property damage.
ASSEMBLY
Refer to Figure 2 on page 2
1. Attach leg assemblies (Ref. No. 2) to
main frame (Ref. No. 1) using
M12x1.75x70L &
M12x1.75x120L bolts, M12x1.75 nuts
& M12x3t washers (Ref. Nos. 3, 15, 4
& 5).
2. Install caps (Ref. No. 17) to cover the
holes on the main frame (Ref. No. 1).
3. Loosen all four of the M12x1.75x70L
bolts (Ref. No. 8) and tighten the
M10x1.5x60L bolts (Ref. No. 11) to
expand the roller insert hole.
Note: Do not overtighten the bolts (Ref.
No. 11). Adjust bolt’s tightness until it is
expanded enough for accepting the
roller (Ref. No. 6).
4. Slide roller (Ref. No. 6) into the roller
insert hole on frame (Ref. No. 7) until it
is aligned with the edge of the hole.
5. Loosen the M10x1.5x60L bolts (Ref.
No. 11) and tighten all the
M12x1.75x70L bolts (Ref. No. 8) to
secure the roller onto the frame.
6. Attach the frame (Ref. No 7) to main
frame (Ref. No. 1) using the pin, c-clip
and roller. (Ref. No. 12, 13 & 14).
7. Install hydraulic unit (Ref. No. 18) in
between the frame and main frame
(Ref. No. 7 & 1).
8. Attach hooks (Ref. No. 21) to chain
(Ref. No. 20).
9. Attach one end of hook (Ref. No. 21)
through angle frame hole and attach
another hook to the other hole.
BEFORE USE
1. Inspect before each use. Do not use if
bent, broken, leaking or cracked
components are noted. Ensure that
casters, rollers and lift arm moves
freely. Check and tighten any loose
assemblies.
2. Verify that the product and the
application are compatible.
3. Read, understand and follow vehicle
manufacturer’s recommended tire
change procedures.
4. With jack in fully lowered position,
locate and remove oil filler plug. This
purges the hydraulic system of
pressurized air trapped in reservoir.
Check fluid level. Proper level is even
with filler plug hole.
5. Reinstall oil filler plug.
HOW TO USE
1. Set emergency brake, chock tires of
diagonally opposed wheel(s) in both
directions AND take every precaution
necessary to ensure setup is stable
and prevent inadvertent vehicle
Main Frame
Load Leveler
with Caster
(not shown)
SHI 021
Printed in China
11/09
Angle Frame
Roller