
Installation instructions
10
Wire connection steps:
(1)
Electric box cover removal
Unscrew the mounting screws to remove the electric box cover.
(2) Fasten the power supply cable and the transmission cable to the conduit holder using the lock nut.
(3) Connect the power supply cable and the transmission cable to terminal.
(4) Fasten the power supply cable and the transmission cable with the cable clamp.
(5) Seal holes and gaps using putty.
Place the cables side by side. (Do not overlap the cables.)
(6) Re-install the electric box cover back after completion of the work.
Lock nut
(field-supplied)
Conduit plate
Conduit connector
(field-supplied)
Power supply
Transmitting cable
(to wired controller)
(1) Remove the screws, maintenance plate, and the valve cover.
(2) Pass transmitting cable and power supply through the two holes on the right side plate.
(3) Fasten the conduit connection to the right side plate using the lock nut.
(4) Connect the transmission cable and power supply to the terminal.
(5) Tie the transmission cable and power supply with the clamp tightly.
(6) After completing the wiring, seal holes and gaps using putty.
(7) Re-install the maintenance plate and the valve cover after completion of the work.
48K/60K
24K/36K
Maintenance plate
Valve cover
Conduit connector for power supply
Lock nut(Qty:2)
Transmitting cable
Power supply
Right side plate
Conduit connector for
transmitting cable
Maintenance
plate
Valve cover
Right side plate
Hole
Conduit connector
Lock nut