
13
Ø
Starting at the end opposite from the “right
of door” or “left of door” label, roll up the wall
panel tightly.
Ø
Continue rolling until the wall section is in one
compact package. Fold the remaining three
vinyl wall panels in the same way, Return
the wall panels to their labeled field bags for
transport and storage.
Ø
The insulated wall panels are folded in a
similar way, except you will want to start with
the interior (white) side of insulation facing
upwards. Then fold in thirds starting from
the bottom edge, and roll up identically to the
vinyl walls. Return the insulated wall panels to
their vinyl storage bags.
3. Fold floor panel
Ø
Remove and set aside all the shelter base
bars.
Ø
Move the shelter legs off of the floor, so it can
be folded freely.
Ø
Begin with the floor spread flat.
Ø
Fold both shorter sides of the floor toward
the middle to form a rectangle, as pictured.
Ø
Fold in the two longer sides so they meet in
the middle of the floor.