8
B20352 ECN-12354 (0301)
ELECTRICAL
1. A 24 VAC power supply transformer is furnished with the manifold control unit. Mount the box onto the wall, to the
left of the manifold, with the top edge approximately aligned with top of the control unit. The attached control cable
terminates into a 7 prong plug matching a receptacle on the left side of the control unit, (Figure 8).
2. After mounting the power supply box to the wall, plug the cable into the control unit receptacle.
FULLY AUTOMATIC HEALTH CARE GAS MANIFOLD
FHM2
875 BASSETT ROAD
WESTLAKE, OHIO 44145
1-800-783-7890
WESTERN INNOVATOR
RIGHT BANK
READY FOR USE
BANK DEPLETED
IN SERVICE
IN SERVICE
LEFT BANK
BANK DEPLETED
READY FOR USE
SYSTEM NORMAL
LINE PRESSURE
Figure 8
Figure 9
Connect black and white wires (from 115
VAC supply) to either black wire in the power
3. The center hole on the underside of the power supply box provides access for conduit and connection of 115 VAC
power. Connect the 115 VAC black and white leads to the power supply as shown. (Figure 9)
4. Connect the ground wire to the ground terminal as shown in figure 9.
5. After completing the 115 VAC connections, the power supply should be completely installed and 115 VAC power
can be applied.
6. Manifolds with heater have a 3 prong cord that should be plugged into a standard 115 VAC that can provide 4
AMPS.
Ground wire (from 115 VAC supply)
Manifold
Control Unit
115 VAC Conduit
Manifold Cable
(grey)
7 Prong Connector
Power Supply
Box
CAUTION:
•
Turn off all power while connecting and wiring the power supply.