Westeel WaterTank Flat Roof Installation And Storage Instructions Download Page 12

13.  Before the outer periphery roof sheets are installed that will cover the rafter end 

locations, remove the clamps, reposition the attachment brackets for a final time (as 
described above) and tighten the bolted connections in the slots, and secure the rafters 
to the top ring angle with at least 2 self drilling screws at every location.  Also secure the 
outer ends of the roof support ends that were cut to fit the rafter, with a self drilling 
screw.  Insure that the outer end is pushed inward against the slot such that the jacking 
of the roof will not pull against this connection.  All self drilling screws should be 
positioned so as to not interfere with the “valley” crests  of the roof sheet corrugations 
that will be covering,  When inserting these screws roughly position at a multiple of 4” 
from the “hill” crests of sheets already installed.  This will insure the heads of the screws 
do not interfere. 

14.  Place the final roof sheets into place and bolt up the seams. 

 

 

15.  Once all roof sheets are positioned as per the roof sheet layout it is time to “jack” the 

roof.  By holding the regular nut directly above the rafter and by impacting the head of 
the bolt it is possible to raise and lower the roof by pushing against the roof support 
angles.  It is best to start in the middle and progressively work outwards towards the 
edges.  The crest should be highest in the middle and taper outwards towards the 
edges.  Once a location is established and finalized, spin up the lower nut to trap and 
secure in position. 

16.  Trim the roof sheets where the overhang 

material is required to fill in some corner 
voids.  Install these at the proper 
locations.  

 

17.  Progressively work around the roof and 

secure the roof sheets to the to the top 
ring angle with self drilling screws at 
regular intervals (suggest about 8”).  
Remember to first insert the foam 
adhesive in between if this feature is 
desired. (See Step 2b.) 

18.  Trim the excess roof sheet material 

relative to the top ring angle. 

 
 
 
 
 
 
 
 
 
 
 

NOTE:

 install inspection hatch at this stage, before closing all access to the interior 

with roof sheets. See inspection hatch installation page. 

Page 12 

NOTE:

 Always refer to roof sheet layout. 

Summary of Contents for WaterTank Flat Roof

Page 1: ...art Number 199748 Revision 0 WaterTank Flat Roof INSTALLATION AND STORAGE INSTRUCTIONS READ THESE INSTRUCTIONS CAREFULLY AND COMPLETELY BEFORE BEGINNING FOUNDATION OR ASSEMBLY EFFECTIVE DATE August 2013 ...

Page 2: ...Page 2 NEW IN THIS MANUAL First release ...

Page 3: ...rly assess or investigate the claim Westeel will not be responsible for the removal of any of the goods found to be defective or transportation charges to and from Westeel s authorized dealer or distributor or for installation of any replacement goods and or parts furnished under the warranty 4 Limitations as to Scope of Warranty The warranty does not extend to defects or damage caused in whole or...

Page 4: ...ES IN CONNECTION WITH THIS WARRANTY ARE THOSE SET FORTH IN THIS WARRANTY IN NO EVENT WILL WESTEEL ITS DEALERS OR ANY COMPANY AFFILIATED WITH WESTEEL BE LIABLE FOR INCIDENTAL CONSEQUENTIAL OR PUNITIVE DAMAGES Some jurisdictions do not allow waivers of certain warranties so the above waivers may not apply to you In that event any implied warranties are limited in duration to ninety 90 days from deli...

Page 5: ...n grain bins varies with height and diameter Many standard designs have significant seismic capabilities Designs can be reviewed and or modified to reflect local seismic requirements 4 Little to no roof snow load was considered in the design of the water tank flat roofs Site and Assembly Unless otherwise specifically provided in writing Westeel does not take responsibility for any defects or damag...

Page 6: ...s remain centered and the amount of engagement between all expanders on the same ring is equalized 7 Before anchoring the tank to the foundation ensure that the tank is round The maximum variation from perfect roundness is 3 4 on the radius see details in wall sheet section of manual Locate anchor bolts towards the outside of the anchor bolt holes away from tank to permit the incremental expansion...

Page 7: ...id damage or injury from material falling when in storage 2 Any boxed goods that become wet should be dried and stored in a new box that is free of moisture 3 In addition to wiping down panels food grade oil can also be applied with a clean lint free cloth This will assist in preventing any further moisture from contacting the galvanizing on the steel IMPORTANT NOTES 1 In order to maintain your wa...

Page 8: ...he distance between the bolt hole locations along the top edge of adjacent rafters and for the orientation of the rafters not all rafters are assembled in the same orientation 5 Assemble the attachment brackets to the each end of the Z rafters as shown Make sure the tabs on the brackets are positioned on the top side i e the side with holes evenly spaced at 44 Note that there are right and left at...

Page 9: ...des although a slight gap may be necessary to insure proper installation of the liner Keep the gap as small as possible Once the rafters are roughly positioned use a clamp to secure the tabs on the rafter brackets at each end to the top ring angles to hold the position and to prevent that rafters from falling off in subsequent steps 8 As rafters are installed attach the stabilization rods that spa...

Page 10: ... such that the threaded shank protrudes above the lock nut enough to eventually accommodate the roof support angles the corrugation of the roof sheets and a second lock nut This is about 1 of exposed shank c The jack bolts will eventually lift the center of the roof up to 2 to 3 and then taper towards the top ring angles If a hole in the rafters is very close to the top ring angle there will likel...

Page 11: ...k nuts g As the roof sheets are being installed the jack bolts should remain oriented in a vertical position and should not be forced out of alignment excessively If this occurs or if holes do not align the clamps holding the rafter ends may need to be loosened and the rafter repositioned slightly to enhance alignment Repositioning a rafter may also result in the repositioning of the attachment si...

Page 12: ... all roof sheets are positioned as per the roof sheet layout it is time to jack the roof By holding the regular nut directly above the rafter and by impacting the head of the bolt it is possible to raise and lower the roof by pushing against the roof support angles It is best to start in the middle and progressively work outwards towards the edges The crest should be highest in the middle and tape...

Page 13: ... Line the bottom of the collar with sealant tape if installing from the outside Once hole is cut place collar on top or underneath roof panel Bolt using holes in collar Use Tek screws if there is any warping and the collar needs to be secured further Use chalking not supplied to seal any gaps NOTE Inclined roof installation shown but flat roof installation is identical in method TRACE AND CUT THRU...

Page 14: ...reas are upper surfaces with mounting holes Spacing between rafters are measured from center mounting holes on upper flange All dimensions are in inches 9 BIN 12 BIN Page 14 NOTE 9 DOES NOT USE Z RAFTERS IT USES ANGLE RAFTERS ...

Page 15: ...15 BIN 18 BIN Page 15 ...

Page 16: ...24 BIN 21 BIN Page 16 ...

Page 17: ...ROOF SHEET LAYOUTS All dimensions are in inches Page 17 9 BIN ...

Page 18: ...1 B 2 2 1 3 3 4 A 4 Page 18 12 BIN ...

Page 19: ...1 1 2 2 3 3 4 4 B A 15 BIN Page 19 ...

Page 20: ...A 1 1 5 2 2 5 B E C D 4 3 3 4 18 BIN Page 20 ...

Page 21: ...1 A 1 4 B 4 2 3 2 3 C D 21 BIN Page 21 ...

Page 22: ...1 2 3 4 1 4 3 2 A B 24 BIN Page 22 ...

Page 23: ...Westeel Division of Vicwest Corporation Printed in Canada 450 Desautels P O Box 792 Winnipeg Manitoba CANADA R3C 2N5 Phone 204 233 7133 Fax 204 235 0796 www westeel com ...

Reviews: