background image

11

Lowering a Tower (continued)

2.  Raise the over center latch and 

 

remove it from the striker plate to 

 

unlock the upper assembly.

NOTE:

  The over center latch must  

 

be totally disengaged from 

 

 

the striker plate prior to 

 

 

lowering the tower.

3.  Use the push/pull tool to lower the upper assembly 

 

down to the storage position.

Lower the 

Upper 

Assembly

Fit  

Push/Pull Tool 

over Receiver

Over Center 

Latch

Striker 

Plate

Raise latch over 

plate and  

lower to lock

Push/Pull 

Tool

Summary of Contents for Legacy Select

Page 1: ... Tower 10 Maintenance 12 Visit the Legacy Select Acoustic Tower web page at wengercorp com for more details Note Please read and understand these instructions before operating Note If you need additional information contact Wenger Corporation using the information below Wenger Corporation 2018 Printed in USA 2018 12 Part 186A895 01 Wenger Corporation 555 Park Drive P O Box 448 Owatonna Minnesota 5...

Page 2: ...he right to change this product at any time The information in this document is not intended to cover all possible conditions and situations that might occur The end user must exercise caution and common sense when assembling or installing Wenger Corporation products If any questions or problems arise call the Wenger Corporation at 800 4WENGER 493 6437 or 1 507 455 4100 worldwide Manufacturer The ...

Page 3: ...ions CAUTION Always observe and comply with any Warnings or Cautions in this document CAUTION Always observe and comply with any Warnings or Cautions posted on the system equipment CAUTION Never use the tower to support scenery signs lighting etc CAUTION Never move the tower more than a few feet when it is in the performance position CAUTION Always have the tower in the storage position when movin...

Page 4: ...panels Upper Assembly The top of the three acoustical reflector panels Lower Assembly The middle of the three acoustical reflector panels Filler Panel The bottom of the three acoustical reflector panels This panel is removable Raising Setting up a tower Lowering Taking down a tower Storage Position When a tower is folded down Performance Position When a tower is fully raised Tower in Performance P...

Page 5: ...tem Description 1 Upper Assembly 2 Lower Assembly 3 Filler Panel 4 Base 5 Locking Lever 6 Lower Frame 7 Gas Spring 8 Over Center Latch 9 Upper Frame 10 Receiver for Push Pull Tool 11 Push Pull Tool 4 10 1 2 3 11 8 5 6 7 9 ...

Page 6: ... mm Each additional tower will nest with the others as shown requiring an additional 20 3 4 527 mm of depth per unit Store the towers in a space that is clean and dry Avoid spaces with high heat extreme cold or very humid conditions To prevent damage transport towers individually and never nested in a group CAUTION Do not use a powered device such as a fork lift to transport the towers CAUTION 20 ...

Page 7: ...towers sideways when going up or down a ramp To avoid fingerprints on the panels have clean hands or wear clean gloves Arranging the Towers Each tower is 72 1829 mm wide While they are still in the storage position arrange the towers as desired in a row or arc Check for overhead clearance and for fit with risers and other equipment in the performance space Roll the towers about 6 15 cm apart to al...

Page 8: ... Raise the over center latch and close it over the striker plate to lock the upper assembly in place NOTE Make sure that the over center latch is locked onto the striker plate Lift the Upper Assembly Fit Push Pull Tool over Receiver Over Center Latch Striker Plate Raise latch over plate and lower to lock Push Pull Tool ...

Page 9: ...de of the tower b Holding the filler panel handles place the filler panel into position below the lower assembly c Lock the filler panel to the lower assembly with one person holding the filler panel in place and a second person engaging the hook rods with the locking lever and closing the locking lever Filler Panel Locking Lever Hook Rods Filler panel can be stored at back side of tower ...

Page 10: ...in place and a second person disengaging the hook rods with the locking lever and opening the locking lever b Holding the filler panel handles remove the filler panel from the lower assembly c The filler panel can be stored on the back side of the tower Filler Panel Locking Lever Hook Rods Filler panel can be stored at back side of tower ...

Page 11: ...TE The over center latch must be totally disengaged from the striker plate prior to lowering the tower 3 Use the push pull tool to lower the upper assembly down to the storage position Lower the Upper Assembly Fit Push Pull Tool over Receiver Over Center Latch Striker Plate Raise latch over plate and lower to lock Push Pull Tool ...

Page 12: ...ically every three or four uses check for loose or damaged parts and for loose fasteners Replace or repair damaged parts promptly Refer to the Replacement Parts List Panel Repair Panels are of lightweight composite construction and made of durable materials If damaged repairs can be made with common fillers and paint Do not make mechanical adjustments to the tower or remove any components Contact ...

Reviews: