![Wenger Gearboss AirPro Installation And Owner'S Instructions Download Page 23](http://html1.mh-extra.com/html/wenger/gearboss-airpro/gearboss-airpro_installation-and-owners-instructions_956686023.webp)
23
Island Configuration Installation (continued)
14. Using more than one person, lift the bank of lockers upright and onto the installation location.
Note:
Be careful not to apply too much sideways force on the support legs.
15. Assemble all of the remaining banks of extension lockers by repeating steps 2-14.
16. Attach the Support Legs of the starter bank of lockers to the floor.
a. With the locker in it’s installation location, unscrew the Adjustable Feet to level the lockers
and set the height from the floor. Mark the location of one hole on each of the feet
.
Note:
Only one hole need to be marked, choose the most accessible hole.
b. Move the locker to allow access to the marked locations.
c. Drill pilot holes into the marked floor locations.
e. Move the locker back to it’s installation location.
f. Secure each Adjustable Foot into the
floor pilot holes using the appropriate
fasteners and method described in
the “Fasteners - Not Supplied”
section.
Mark the most
accessible hole
To avoid damage and injury,
more than one person is
needed for installation.
!
CAUTION
Bottom Grilles are shown
removed for clarity.