- 15 -
Installation steps
Step 1
- Alignment of height-adjustable feet with spirit level.
- Slightly carve off concrete in siphon area, if necessary.
Step 2
- Press the flat seal from above into the drainage outlet, press siphon body [7] from below onto the
drain and fasten tightly with the drainage valve [6] from above.
- Connect the sewage hose to the siphon body [7] and connect with in-house sewage system.
- Insert cleaning bit [5], press the cover [4] on.
Step 3
- The tub is to be aligned with vertical walls in a 90 degree angle by means of a spirit level.
- The joints are to be filled with silicone. Select type of silicone in accordance with construction
material used. Please mind curing times.
Allow 24 hours for silicone
to dry before first use.
24
hours
Max. 150 kg
Summary of Contents for Summer 12051354
Page 4: ... 4 Verpackungsinhalt 1 1 x Duschwanne 2 1 x Siphon Garnitur ...
Page 6: ... 6 4 Chromabdeckung 5 entnehmbarer Reinigungseinsatz 6 Ablaufventil 7 Siphonkörper 4 5 6 7 ...
Page 11: ... 11 This product is heavy and may require two people to install Tools required ...
Page 12: ... 12 Box contents 1 1 x Shower tub 2 1 x Siphon set ...
Page 14: ... 14 4 Chrome cover 5 Removable cleaning insert 6 Drainage valve 7 Siphon body 4 5 6 7 ...
Page 20: ... 20 Contenu de l emballage 1 1 x receveur de douche 2 1 x garniture de ...
Page 28: ... 28 Contenuto della confezione 1 1 x piatto doccia 2 1 x kit sifone ...
Page 30: ... 30 4 copertura cromata 5 inserto di pulizia estraibile 6 valvola di scarico 7 sifone 4 5 6 7 ...