- 20 -
Installation steps
Step 1
- Alignment of height-adjustable feet with spirit level.
- In the siphon area concrete is to be chipped off if necessary.
Step 2
- Press the flat seal from above into the drainage outlet, press siphon body [7] from below onto the
drain and fasten tightly with the drainage valve [6] from above.
- Connect the waste water hose to the siphon body [7] and hook it up with the in-house water
disposal.
- Insert cleaning bit [5], press the cover [4] on.
Step 3
- The tub is to be aligned with vertical walls in a 90 degree angle by means of a spirit level.
- The joints are to be filled with silicone. The silicone is to be chosen respectively to the construction
materials used - please respect cure times.
Summary of Contents for 698607
Page 6: ...6 4 Chromabdeckung 5 entnehmbarer Reinigungseinsatz 6 Ablaufventil 7 Siphonk rper 4 5 6 7...
Page 12: ...12...
Page 18: ...18 4 Chrome cover 5 Removable cleaning bit 6 Drainage valve 7 Siphon body 4 5 6 7...
Page 24: ...24...
Page 36: ...36...
Page 42: ...42 4 copertura cromata 5 inserto di pulizia estraibile 6 valvola di scarico 7 sifone 4 5 6 7...
Page 48: ...48...
Page 54: ...54 4 verchroomde afdekking 5 uitneembaar reinigingsrooster 6 afvoerventiel 7 sifonstuk 4 5 6 7...
Page 60: ...60...
Page 62: ...62 2 24...
Page 63: ...63 3 2mm 6mm 3 2mm 6mm...
Page 65: ...65 140 1 2 3 1 1 2 5 3 M85 M42...
Page 66: ...66 4 5 6 7 4 5 6 7...
Page 68: ...68 1 2 7 6 7 5 4 3 90...
Page 70: ...70 1 2 2 1 2 3 1 3 3 2 1 6 7...
Page 72: ......