3. The urinal light on the box or other soft pad, after smooth, cover the sealing ring in the
drainage holes, then alignment the hook, hitch up the urinal, make the mounting screws
through two mounting holes on the urinal bottom.
4. After adjust the urinal smooth, use the hand
tightening the installation nut, and then use the
tool extra screw up, and finally cover the decorate
nut, installed the filter in the urinal
Note: When you use the tool screw up the nut,
the force should not be too big to avoid damage to
the product.
Sealing ring
Note:
after the sealing ring stability should be immediately enter into the installation work,
otherwise the time is long, the sealing ring due to shrinkage and fall of, in order to ensure
the sealing ring not shift, when necessary, should have another person protected the seal.
Summary of Contents for Evolo WF00052
Page 12: ...305 358 690 Evolo...