31
B. Install SPM
®
FSR Anchor Lines on the Main Flow Line to the
Well Head
1. Figure 5 demonstrates the Main Flow Line and the set up of two
SPM
®
FSR Anchor Lines. The directions towards the well head and
towards the frac truck are illustrated.
Figure 5. Main Flow Line with SPM
®
FSR Anchor Lines
2. As shown in Figure 6, follow the three steps to install SPM
®
FSR Spine 1 as the connection loops.
a. Step 1 – Begin by positioning SPM
®
FSR Spine 1
beneath the main flow line as shown. The Spine profile
should straddle union assembly.
b. Step 2 – Bring End “A” up and over piping and union
assembly. Insert End “A” down through End “B”
opening. Pull “A” back through to original side as
shown.
c. Step 3 – Continue to bring End “A” back around to form
a second loop. The Spine profile should still evenly
straddle union assembly as shown.
d. Keep the loop as small as possible. If SPM
®
FSR Spine
1 is too long make multiple loops around until the Left
and Right Connection Loops are close to the straight
pipe section.
Towards
Well Head
Main
Flow Line
Towards Frac Truck
or Similar Device
SPM
®
FSR
Anchor Lines