WATER
BOILER
—
Boiler Manual
Prepare boiler location
(continued)
Place the boiler:
Remove outer crate
1. Remove outer crate, leaving boiler on the crate base.
2. Remove the circulator and barometric damper cartons from the crate
base.
5/BOILERSONLY2EMOVETHETWOmUEBAFmESFASTENEDTOTHECRATE
base behind the boiler.
4. Remove the two shipping channels by loosening and removing the four
NUTS3AVETHESHIPPINGCHANNELSFORLEVELINGLEGINSTALLATION
5. Remove the jacket crosstie fastened to the crate base.
Install the leveling legs if used (required if boiler is placed on
combustible flooring)
The leveling legs must be installed if the boiler is placed on
combustible flooring.
!SECONDPERSONOROTHERMEANSISREQUIREDTOSTABILIZETHE
boiler during leveling leg installation. Failure to do so could
result in severe personal injury or property damage.
Wear heavy leather work gloves when handling the shipping
channels in the following steps to avoid potential severe per-
sonal injury.
&IGUREA 5SEONECHANNELASALEVERTORAISETHEFRONTOFTHEBOILER
2. (Figure 2a) Insert the other channel between the boiler leg and crate
base. Place the channel directly over the crate base runner, as shown.
3. (Figure 2b) Lift the channel under the boiler leg slightly.
&IGUREB 3LIDETHEOTHERCHANNELUNDERTHEOTHERBOILERLEG0LACETHE
channel directly over the crate base runner, as shown.
5. (Figure 3) With the boiler resting securely on the two shipping chan-
NELSSCREWALEVELINGLEGINEACHBOILERLEGHOLE3CREWLEVELINGLEGSIN
completely.
4OAVOIDPOTENTIALPERSONALINJURYORPROPERTYDAMAGE$/
./4ATTEMPTTOINSERTLEVELINGLEGSUNLESSTHEBOILERISSECURELY
seated on both shipping channels.
6. Reverse steps 2 through 4 above to remove the shipping channels. Leave
the boiler on the crate base.
7. Follow steps 2 through 6 on the back side of the boiler to install leveling
legs in the rear section legs.
8. Leave the boiler on the crate base.
Remove boiler from crate base
"OILERSMAYBETOPHEAVY5SECAUTIONWHENHANDLINGTOAVOID
personal injury or property damage.
1. Attach the crosstie to the jacket side panels using the two screws located
in the barometric damper carton. Then remove the boiler from the crate
base.
Do not remove the boiler from the crate base without first
installing the jacket crosstie. The boiler wiring harnesses or
connectors could be damaged.
)FNECESSARYTHEBOILERJACKETCANBEREMOVEDFORHANDLING3EEPAGES
and 31 in this manual for the jacket removal/replacement procedure.
&IGUREA
To install leveling legs: Insert first
shipping channel under boiler leg.
&IGURE
Inserting levelling legs
&IGUREA
To install leveling legs: Insert second
shipping channel under other leg.
Part number 550-141-986/0112
10