Weil-McLain SGO Series Maintenance And Service Manual Download Page 2

2

Hazard Definitions

Following terms are used to bring attention to the presence of hazards of various risk levels, or 
to important information concerning product life.

 

Indicates presence of hazards that will cause severe personal injury, death or 

 

substantial  property damage if ignored.

 

Indicates presence of hazards that can cause severe personal injury, death or 

 

substantial  property damage if ignored. 

 

Indicates presence of hazards that will or can cause minor personal injury or 

 

property damage if ignored.

 

Indicates special instructions on installation, operation, or maintenance that 

 

are important but not related to personal injury hazards.

Read  This Page First

Symbol Definitions

These symbols indicate information for and procedures to be followed by: 

Homeowner or person responsible for simple start-up and routine 
maintenance of boiler and system.

 Pages 2 through 6 must be followed 

to assure proper operation of your boiler. Page 7 lists common problems 
and possible corrections. In addition, it is your responsibility to:
 

Have boiler and burner installed by a qualified installer.

 

Have boiler and burner serviced annually by a qualified service  

 

 technician.
 

Review and understand start-up and routine maintenance 

 

procedures with qualified service technician.

 

Perform routine maintenance as described on page 4. 

Qualified service technician who has the necessary equipment to 
check the boiler and system performance, and is responsible for 
start-up and service of boiler and system.

 Pages 2 and 3 and 8 through 

11 must be followed to assure proper operation of this boiler. 
In addition, it is the responsibility of this person to:

 

Annually service boiler and burner to assure proper operation. See page 8 

 

for service record.

 

Review and explain start-up and routine maintenance procedures with 

 homeowner.
 

L

L

L

L

L

L

Part No. 550-141-830/1202

Summary of Contents for SGO Series

Page 1: ...or future reference leave this manual with other boiler instructions in the envelope provided with the boiler Maintenance and Service Guide Part No 550 141 830 1202 SGO Series 3 Oil Fired Steam Boiler...

Page 2: ...ine maintenance of boiler and system Pages 2 through 6 must be followed to assure proper operation of your boiler Page 7 lists common problems and possible corrections In addition it is your responsib...

Page 3: ...gasoline See burner manual for proper fuel oil Do not attempt to start burner when excess oil has accumulated in combustion chamber when unit is full of vapor or when combus tion chamber is very hot D...

Page 4: ...t type low water cutoff when used Refer to control manufacturer s instructions Scald potential Do not blow down low water cutoff unless blowdown piping has been installed according to Boiler Manual If...

Page 5: ...team ReliefValve on back of boiler SGO with oat type low water cutoff 1 If burner does not re check for Switch on boiler or additional shut off switches turned off Fuses or breaker switch tripped Ther...

Page 6: ...turned off Fuses or breaker switch tripped Thermostat set below room temperature Fuel valves turned off Not enough oil in tank to supply burner No water in gauge glass Start up SGO Boiler with Probe T...

Page 7: ...pair clean or replace air vents or traps Water disappearing from gauge glass and back into system through return piping Incorrect Hartford Loop piping Have qualified service technician pipe boiler exa...

Page 8: ...ds 2 Check for and remove any obstruction to combustion and ventilation air flow to boiler 3 Check breeching and chimney or vent for obstructions damage etc Repair or replace as necessary 4 Clean boil...

Page 9: ...Move to the bottom of the ueways and clean up between the sections to reach pins left uncleaned in step 5 Thoroughly clean ueways between all pins at all angles Start on top of boiler nish from the b...

Page 10: ...aps and air vents for proper opera tion 7 Process may need to be repeated after several weeks of operation L L L L Detailed Service Procedures To place in operation Follow information below to prevent...

Page 11: ...cock The water level should immediately rise to its proper level 4 If gauge glass breaks close off both gauge cocks and loosen glass retaining nuts to remove gauge glass Do not use thin glass tubing...

Page 12: ...Part No 550 141 830 1202...

Reviews: