Low Fire Adjustment

1. Disable high fire by disconnecting the blue wire in the two-stage gas valve.
2. Connect manometer to gas manifold (manometer must be capable of measuring 0” to 14”

W.C.).

3. Turn on electrical power supply and gas supply to boiler.
4. Fire boiler, which will light off and remain on low fire.
5. While reading manometer, turn low fire adjustment screw clockwise (Figure 5) until pressure

reading is 1.2” W.C.

6. Turn off boiler.

7. Remove manometer from manifold and plug the tapping.
8. Reconnect the blue wire in the two-stage gas valve junction box.
9. Turn on electrical power supply and gas supply to boiler.
10. Follow operating instructions label on boiler to set boiler in operation.

Turn off electrical power supply and gas supply to boiler before making the following connections
and adjustment.  Failure to do so can cause severe personal injury, death or substantial property
damage.

Turn off electrical power supply and gas supply to boiler before the following steps.  Failure to
do so can cause severe personal injury, death or substantial property damage.

Figure 8

Low fire adjustment

Summary of Contents for FLAME GUARDIAN WMBC-1A

Page 1: ...ds that can cause severe personal injury death or substantial property damage Indicatesspecialinstructionsoninstallation operationormaintenancethat are important but not related to personal injury or...

Page 2: ...ain recommends installing manual controls in addition to standard as required by local inspector Refer to the LGB Boiler Manual Boiler Controls section a Steam boilers require a manual reset Low Water...

Page 3: ...WMBC Panel Terminal G2 Ground Terminal Pilot Mounting Bracket 10 32 x 1 4 Machine Screws 2 Main Burner with Pilot Mounting Bracket Compression Union Sensor Lead Burner Support Bar Pilot Line Tubing I...

Page 4: ...d gas valve w on off actuator 5 Pilot gas pressure regulator 6 Normally open solenoid vent valve 7 Pilot solenoid gas valve 8 Test cock 10 Manual leak checking gas valve 11 Regulating diaphragm gas va...

Page 5: ...during any pressure test greater than 14 0 inches water column 11 Set gas pressure switches as follows or to local inspector s requirements a Low 3 0 W C b High 14 0 W C II Gas piping Do not check for...

Page 6: ...Part Number 550 141 807 0298 6 LGB Series2 ControlSupplement Part Number 550 141 807 0298 7 Flame Guardian WMBC 1A Electronic Pilot System IRI Figure 5 WMBC 1A panel wiring schematic...

Page 7: ...Part Number 550 141 807 0298 8 LGB Series2 ControlSupplement Figure 6 WMBC 1A panel wiring diagram factory wiring...

Page 8: ...Part Number 550 141 807 0298 9 Flame Guardian WMBC 1A Electronic Pilot System IRI Figure 7 WMBC 1A field wiring diagram...

Page 9: ...1 2 W C 6 Turn off boiler 7 Remove manometer from manifold and plug the tapping 8 Reconnect the blue wire in the two stage gas valve junction box 9 Turn on electrical power supply and gas supply to b...

Page 10: ...d trial for main flame Yellow pilot on lamp goes out 6 Main flame sensor proves main burner operation at low fire 7 Flame safeguard control energizes downstream gas valve to high fire through firing r...

Page 11: ...415 Pilot Burner Honeywell Q179C1009 511 330 181 Pilot Bracket Weil McLain 460 005 624 Main Flame Sensor Honeywell 392956 511 724 274 Main Flame Sensor Bracket Weil McLain 423 300 420 Main Burner with...

Reviews: