background image

CSD-1 control system — Natural gas

Part Number 550-110-677/0299

9

General

The following sequence of operation applies to all wiring diagrams in this Supplement — both
water and steam.

Call for heat

On a call for heat (from thermostat or operating control):

1. Limit control and water level control contacts are assumed closed.

2. Vent damper (if provided) will open.

3. Ignition control checks for signal at pilot. (No signal should be present.)

If no signal is sensed

 (normal condition):

a. Pilot solenoid opens.
b. Pilot ignition spark begins.
c. Pilot ignites.
d. Pilot proves.

If a signal is sensed

 (abnormal condition) by the ignition control, the control will lockout.

On failure to establish pilot flame signal within 15 seconds, the ignition control
will turn off the pilot gas valve. It will wait 5 minutes, then retry for ignition.
If the second ignition attempt fails, the ignition control will lockout and
illuminate the red lockout light.

This will activate the alarm contact of the impulse relay, providing an isolated
contact closure across terminals A1 and A2 of the CSD-1 control panel
terminal strip. The contact rating is 15 amps at 250VAC.

To reset the boiler, push the red reset button on the CSD-1 control panel.

4. Once pilot is proved the ignition control activates main gas valve. Main burners will ignite

and boiler will continue to fire until terminated by limit action or no call for heat.

Lockout modes

In addition to lockout on flame-sense failure, the boiler may also experience lockout due to
shutdown of a manual reset control.

The boiler is equipped with a manual reset limit control and a manual reset
low water cutoff. Should the limit control lockout, it can only be reset by
pressing the reset button on the control. The manual reset probe low water
cutoff can be reset after lockout by pressing the reset button on the control or
by interrupting power momentarily.

Steam boilers — Do not substitute another manual reset low water cutoff for
the one specified and supplied with the boiler. Other controls may not operate
as intended and could cause serious operating problems or failures.

Troubleshooting

Refer to Section VIII, 

Check-out procedure — troubleshooting

, of this Supplement and to

component manufacturer’s literature supplied in the boiler manual envelope for further
information on operating conditions.

Wiring — sequence of operation

VI

Summary of Contents for CSD-1

Page 1: ...ement Control Supplement EGH EGH EGH EGH EGHGas Fired Boiler EGH 105 to EGH 125 Series 4 Natural gas Part No 550 110 677 0299 CSD 1 control system For propane boilers install EGH propane conversion ki...

Page 2: ...IX Service and maintenance 31 X Replacement parts 32 This Control Supplement must only be used by a qualified installer service technician Read these instructions completely before beginning the insta...

Page 3: ...Steam CSD 1 gravity return or 381 700 408 381 700 408 381 700 408 Steam CSD 1 pumped return 381 700 410 381 700 410 381 700 410 Note a CSD 1 water boilers cannot be equipped with a tankless heater No...

Page 4: ...ghten nipple Pipe lower half of ground joint union to the 1 nipple Figure 1 item 2 Knock out the jacket gas valve opening on the desired side of the boiler may be routed through either right or left s...

Page 5: ...er See Figure 2 Screws or rivets used to secure the damper to the vent pipe and the draft hood must not interfere with rotation of the damper blade Install damper harness between damper actuator and k...

Page 6: ...f must be mounted between the boiler and any isolation valve s installed in the piping Install water trim components as required by ASME CSD 1 latest edition See Figure 3 and Table 2 for controls requ...

Page 7: ...Failure to do so could result in nuisance shutdowns and possible lockout on the manual reset control due to water level variations from end to end Substantial property damage could result from freezin...

Page 8: ...NFPA No 70 latest edition Use 105 C thermoplastic wire or equivalent if any original wire must be replaced except for pilot spark and sense wires Wiring procedure 1 Mount all controls as directed in S...

Page 9: ...inal strip The contact rating is 15 amps at 250VAC To reset the boiler push the red reset button on the CSD 1 control panel 4 Once pilot is proved the ignition control activates main gas valve Main bu...

Page 10: ...OR LOCAL 1 ALL WIRING MUST BE INSTALLED IN ACCORDANCE WITH ELECTRICAL SHOCK HAZARD CAN CAUSE SEVERE INJURY OR DEATH DISCONNECT POWER BEFORE INSTALLING AND OR SERVICING 2 ALL CONTACTS SHOWN WITHOUT POW...

Page 11: ...IRE NUTS 3 W BK Y BK G Y G BK BK DAMPER TO BK R TRANSFORMER 120 24 V A C RELAY DPST PLUG IN CABLE G NOTE 5 THERMOSTAT OR EMCS PROBE LWCO W BK G BK CONNECTOR DAMPER Y GAS VALVE ROBERTSHAW D D TH TR BK...

Page 12: ...9 11 12 14 15 15 16 17 18 19 20 24 21 25 21 22 23 7 Vent connections Connect with tubing and run vent line outside building per code requirements Install strain relief bushings wherever electrical wir...

Page 13: ...h 16 Gas supply connection 17 Burner manifold 5 Transformer relay 18 Limit control auto reset 6 Junction box 19 Limit control manual reset 7 Damper optional 20 Pressure temperature gauge 8 Damper conn...

Page 14: ...L WIRING MUST BE INSTALLED IN ACCORDANCE WITH ELECTRICAL SHOCK HAZARD CAN CAUSE SEVERE INJURY OR DEATH DISCONNECT POWER BEFORE INSTALLING AND OR SERVICING 2 ALL CONTACTS SHOWN WITHOUT POWER APPLIED OF...

Page 15: ...ER TO BK R TRANSFORMER 120 24 V A C RELAY DPST PLUG IN CABLE G NOTE 5 THERMOSTAT OR EMCS PROBE LWCO W BK G BK CONNECTOR DAMPER Y GAS VALVE ROBERTSHAW D D TH TR BK W MANUAL RESET O W R NOTE 8 PILOT PRE...

Page 16: ...wherever electrical wiring passes through jacket 7 Vent connections Connect with tubing and run vent line outside building per code requirements 13 13a Figure 8 Control assembly steam gravity return...

Page 17: ...arm silencing switch 16 Gas supply connection 4 Terminal strip 17 Burner manifold 5 Transformer relay 18 Limit control automatic reset 6 Junction box 19 Limit control manual reset 7 Damper optional 20...

Page 18: ...ITH ELECTRICAL SHOCK HAZARD CAN CAUSE SEVERE INJURY OR DEATH DISCONNECT POWER BEFORE INSTALLING AND OR SERVICING 2 ALL CONTACTS SHOWN WITHOUT POWER APPLIED OFF SHELF CONDITION CODE REQUIREMENTS INFORM...

Page 19: ...RMER 120 24 V A C RELAY DPST PLUG IN CABLE G NOTE 5 THERMOSTAT OR EMCS PROBE LWCO W BK G BK CONNECTOR DAMPER Y GAS VALVE ROBERTSHAW D D TH TR BK W MANUAL RESET O W R NOTE 8 PILOT PRESSURETROL MANUAL R...

Page 20: ...iring passes through jacket Vent connections Connect with tubing and run vent line outside building per code requirements 13 13a Figure 10 Control assembly steam pumped return Wiring steam pumped retu...

Page 21: ...alarm silencing switch 16 Gas supply connection 4 Terminal strip 17 Burner manifold 5 Transformer relay 18 Limit control auto reset 6 Junction box 19 Limit control manual reset 7 Damper optional 20 Pr...

Page 22: ...ury death or substantial property damage 2 Inspect base insulation as instructed in Section VII of the EGH Manual Before proceeding 1 Follow Operating instructions Figure 11 to start boiler 2 If boile...

Page 23: ...CSD 1 control system Natural gas Part Number 550 110 677 0299 23 Final adjustments operating instructions VII Figure 11 Operating instructions...

Page 24: ...15 seconds the ignition control turns off the spark and opens the main gas valve dual valves in single body Main burners ignite If pilot does not light and prove within 15 seconds the ignition control...

Page 25: ...rst leak test valve Figure 12 item 3 and check for pressure See NOTICE at right 6 Close first leak test valve Figure 12 item 3 and remove manometer 7 Attachmanometertosecondleaktestvalve Figure 12 ite...

Page 26: ...EN position Apply call for heat to boiler Damper blade should then rotate to open position and boiler will fire 677 14 Effikal damper Johnson Controls damper Closed Open Damper blade indicator Wrench...

Page 27: ...ply voltage operate system several complete heat cycles Replace pilot assembly turn ON supply voltage Operate system several complete heat cycles No Yes No Yes Replace ignition control Retest TS 1 No...

Page 28: ...boiler wiring harness TEMPORARILY install jumper between terminal 2 and terminal 5 on damper plug in boiler wiring harness See figure below Does boiler fire No Yes No Yes TS 2 No Spark System boiler...

Page 29: ...without damper No Yes Make sure sense wire is not wrapped around any pipe or accessories No Yes Replace ignition control Retest Contact gas supplier to correct Correct wiring Retest Replace valve Ret...

Page 30: ...nd from C on transformer to transformer case ground Make sure connections are clean and tight If wire is damaged or deteriorated replace with No 18 gauge moisture resistant thermoplastic insulated wir...

Page 31: ...ystem Natural gas Part Number 550 110 677 0299 31 Service and maintenance IX Complete Installation and Service Certificate in EGH Manual Section IX Follow EGH Manual Section IX for service and mainten...

Page 32: ...Control Supplement Part Number 550 110 677 0299 32 Replacement parts water boilers X Figure 14 Water boiler assembly MV MV PV PV ALARM ALARM 24 V 24 V G ND SENSE SPARK MV MV PV PV ALARM ALARM 24 V 24...

Page 33: ...switch EGH 105 125 Honeywell AML21CBA2AA 511 624 580 Eaton Controls 221K11810 14 Lens cover EGH 105 125 Honeywell AML51 C10R 511 624 581 Eaton Controls 220PM02A 15 Light bulb EGH 105 125 TI available...

Page 34: ...trol Supplement Part Number 550 110 677 0299 34 Replacement parts steam boilers X Figure 15 Steam boiler assembly MV MV PV PV ALARM ALARM 24 V 24 V G ND SENSE SPARK MV MV PV PV ALARM ALARM 24 V 24 V G...

Page 35: ...ell AML51 C10R 511 624 581 Eaton Controls 220PM02A 15 Light bulb EGH 105 125 TI available at local supply house 16 Wiring harness pumped return steam EGH 105 125 Weil McLain 591 391 888 Wiring harness...

Page 36: ...125 EGH 105 to EGH 125 EGH 105 to EGH 125 EGH 105 to EGH 125 EGH 105 to EGH 125 Control Supplement Part Number 550 110 677 0299 36 Weil McLain 500 Blaine Street Michigan City IN 46360 2388 http www w...

Reviews: