
12
21. If the indicated 3 1/2” Pulley (15) is pre-
attached to the Front Upright (42), remove it.
Route the Short Cable (58) around the Pulley.
Attach the Pulley and two Pulley Covers (78)
to the lower hole in the Front Upright with the
3/8” Nylon Jam Nut (81), the 3/8” Flat Washer
(9) and the 3/8” x 3 3/4” Bolt (71).
22. Route the Short Cable (58) around the 3 1/2”
Pulley (15) attached to the upper hole in the
Press Frame (17). Be sure that the Cable
Trap (66) is turned to hold the Cable in
place and that the Cable is routed around
the Pulley as shown. Tighten the 3/8” Nylon
Locknut (21) and the 3/8” x 3 1/2” Bolt (not
shown).
23. If the indicated 3 1/2” Pulley (15) is pre-
attached to the Front Upright (42), remove it.
Route the Short Cable (58) around the Pulley.
Attach the Pulley and two Pulley Covers (78)
to the upper hole in the Front Upright with the
3/8” Nylon Jam Nut (81), the 3/8” Flat Washer
(9) and the 3/8” x 3 3/4” Bolt (71).
23
21
22
CABLE
ASSEMBL
Y
58
58
81
15
66
21
17
9
42
78
15
71
42
58
15
71
78
9
81