23
Ford Transit
Vancouver
24. Install the control panel (2) using four screws
(33). Connect the control panel connector
and install the map light assembly.
25. Route the power portion of the wiring
harness under the flooring to the battery
compartment.
NOTE: Due to vehicle build variations, the
images in this manual may not be represen-
tative.
26.Replace the bottom 60 amp fuse with the
supplied 50 amp fuse. Reinstall the power
distribution center at this time.
Summary of Contents for Transit Vancouver Standard
Page 26: ...26 Ford Transit Wiring Diagram...
Page 27: ...Ford Transit Vancouver 27...