18 | Checklist for the installation of the Webasto charging station
22 / 23
5111232A OI-II Webasto Next
18
Checklist for the installation of the Webasto charging station
Charging station
Webasto Next
Charging power
11 kW
22 kW
Serial number
Material number
General :
Applic-
able/
com-
pleted
Installation, electrical connection and initial operation of the charging station must be carried out by an electrician.
Local conditions:
The charging station has not been installed in an explosion sensitive area (EXzone).
The charging station has been installed in a location where falling objects cannot damage the charging station.
The charging station is installed in an area protected from direct sunlight, as recommended.
Please underline the weather conditions on the installation date: sun, rain, overcast, snow or other
______________________________________________ .
The location of the charging station should be selected such that vehicles cannot inadvertently collide with it.
The legal requirements for electrical installations, fire protection, safety regulations and escape routes have been met.
The charging cable and coupling has been protected against coming into contact with external heat sources, water, dirt
and chemicals.
The charging cable and coupling has been protected against being driven over, trapped, or any other mechanical haz-
ards.
The customer/user was informed how the Webasto Next voltage is switched off with the installation-side protective
devices.
Charging station requirements:
The cable bushing for the mains lead and signal cable has been installed during installation.
The kink protection for the charging cable has been screwed onto the charging station and the rubber seal has been fit-
ted correctly into the kink protection.
The appropriate charging cable (11 kW or 22 kW) has been connected to the charging station (as per type label) during
installation. The strain relief clamp that ensures the charging cable has strain relief has been fitted. The specified torques
have been observed. The charging cable has been connected as per the instructions.
Tools and installation remnants have been removed from the charging station before closing the cover.
The CP line is installed correctly.
The prerequisite of a clockwise phase sequence is met during installation.
The locally applicable test logs should be drawn up during commissioning and a copy should be given to the customer.
Customer/client:
Place:
Signature
:
Date:
Electrician/contractor:
Place:
Signature
:
Date: