SECTION 6: L
IFTING
AN
A
IR
H
ANDLER
11
6.1.3 Liftin
g
an Upri
g
ht Air Handler
All air handlers are shipped in the horizontal position.
Prior to lifting an
u
pright air handler, the follo
w
ing
steps m
u
st be performed (
):
Step 1: The air handler m
u
st be lifted
u
sing the t
w
o
lifting l
u
gs on the top of the discharge end and the
t
w
o lifting l
u
gs on the inlet end,
u
sing a spreader bar
across the long axis. Lift the air handler off the skid
and place it on a flat, clean, dry s
u
rface.
Step 2: Remo
v
e the lifting l
u
gs on the inlet end of the
air handler and re-install hard
w
are.
Step 3: Use all fo
u
r lifting l
u
gs on the discharge end
of the air handler to enable the air handler to be lifted
into the
u
pright position.
Step 4: Lift the air handler into
u
pright position.
Step 5: Next, refer to the applicable portions of
for specific mo
u
nting instr
u
ctions.
FIGURE 2: Liftin
g
an Upri
g
ht Air Handler
Step 1
Remove These
Lifting Lugs
Step 2
Step 3
Step 4
Spreader Bar
I
N
LET
I
N
LET
I
N
LET
I
N
LET
Summary of Contents for XT112
Page 2: ......
Page 4: ......
Page 6: ... 2017 Weather Rite LLC Printed in the U S A ...
Page 50: ...SERIES XT INSTALLATION OPERATION AND SERVICE MANUAL 44 FIGURE 25 Interconect Wiring 2 ...
Page 96: ......
Page 97: ......
Page 98: ......