
UHA L
OW
P
ROFILE
U
NIT
H
EATER
I
NSTALLATION
O
PERATION AND
S
ERVICE
M
ANUAL
40 of 51
14.3 Troubleshooting for Flame Supervision System
NOTE:
Minimum flame probe current 1 µA DC. Typical flame probe current 3-5 µA DC.
To measure flame current, connect a 0 - 50 µA DC meter in series with the flame probe. If the meter
reads negative values, then reverse the test leads.
Summary of Contents for UHA100
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 31: ...SECTION 9 GAS PIPING 23 of 51 Figure 15 Gas Connection ...
Page 46: ...UHA LOW PROFILE UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 38 of 51 14 1 General ...
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......