
SECTION 11: O
PERATION AND
M
AINTENANCE
29 of 51
Figure 16: Automatic Burner Control Sequence
Figure 17: Gas Valve for Models UHA[X][S] 30 - 45
Burner Sequence for Ignition Control
Flame Signal
Start Gas Valve
Ignition Spark
Thermostat 24 V
SHUT DOWN
RUN
START
ts = 10 Seconds
Signals Output By Control
Required Incoming Signals
Flue Blower
Pressure
Switch
P
C
NO
NC
30 Seconds Purge*
*Purge time begins at pressure switch change over.
Axial Fan
30 Seconds Delay
90 Seconds Delay
30 Seconds Post Purge
If at any stage the flame fails, the control will retry
for ignition. The control has four trials for ignition
before a one hour lockout.
Gas Outlet
Outlet Pressure
Pressure Regulator
Description
Part Number
Gas Valve 30 - 45 NG
90034500
Gas Valve 30 - 45 LP
90034600
Summary of Contents for UHA100
Page 2: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 31: ...SECTION 9 GAS PIPING 23 of 51 Figure 15 Gas Connection ...
Page 46: ...UHA LOW PROFILE UNIT HEATER INSTALLATION OPERATION AND SERVICE MANUAL 38 of 51 14 1 General ...
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......