Weather Fast 103-1105N Assembly Manual Download Page 4

ASSEMBLY PREPARATION

 

Place all parts from the packaging box in a cleared area and arrange them on the ground in front of you.

 

Remove all packaging materials and place them back in the box. Do not dispose of the packaging materials until assembly is complete.

 

Check for completeness and transport damages. 

WARNING!

 

Do not place the product under trees from which hard fruit such as apples, walnuts or heavy pine cones, etc., may fall. 

 

Keep children away during assembly. This product contains small parts which can be swallowed by children.

 

Do not attempt to assemble the product if any parts are missing.

 

At least 3 people are needed to complete the assembly as some of the steps require heavy lifting.

ASSEMBLY

WARNING! 

 

Do not leave the shelter unattended during assembly. Otherwise, personal injury or damage to the shed may occur!

Frame assembly overview

4

1

1

1

1

1

1

2

2

2

2

3

3

3

3

3

4

4

4

4

6

6

6

6

5

5

5

5

10

10

12

12

7

7

7

8

8

9

9

3

11

11

11

11

11

11

13

13

13

14

14

18

18

18

6

6

6

6

18

18

Summary of Contents for 103-1105N

Page 1: ...10 x 20 x 8 3 x 6 1 x 2 4 m AUTO STORAGE SHELTER Ideal for all purpose outdoor storage ASSEMBLY MANUAL Model NO 103 1105N TM Tools required for assembly not included...

Page 2: ...bility of the consumer Damages caused by improper anchoring are not covered under warranty Keep all flame and heat sources away from the shelter fabric The fabric will burn if left in continuous conta...

Page 3: ...Tube Roof HorizontalTube Shoulder HorizontalTube Bottom Cross Rails 3 Way Side Connector Left 3 Way Side Connector Right Bent Corner Leg 4 Way Peak Connector 3 Way Peak Connector 4 Way Cross Rail Clam...

Page 4: ...or heavy pine cones etc may fall Keep children away during assembly This product contains small parts which can be swallowed by children Do not attempt to assemble the product if any parts are missin...

Page 5: ...Part 12 Part 7 See Diagram D3 3 Use a rubber or wooden mallet to ensure all pipes are fully inserted There are 10 legs for the whole shelter a Follow Drawing E1 connected tube 2 10 to get the 4 Corner...

Page 6: ...nt a and back corners as welI as the center b Take a diagonal measure as shown in Diagram H When these two measures are equal the frame is square Adjust the frame until they are equal to within 1 c On...

Page 7: ...nd standing at the peak of the shelter the other person inserts the The person standing at the peak assists by ensuring the tarp is partially foIded over the pipes of the end frame and inside or towar...

Page 8: ...he anchor point DO NOT over tighten The shelter is now ready for use Note month of set up and tighten ratchet tie downs and Please check periodically two to three times i n the first week weekly for t...

Reviews: