You’ve made a great choice. FOUNDATION
®
platforms are designed to be easily assembled on-site.
Just follow these step-by-step instructions.
Before you start, review all of the instructions. Choose where you want to build your platform.
Ensure the area is clean and free of debris then determine how you want to orient your platform. If
there is a wall or fixed object the platform will be adjacent to, it is recommended that you start there
to prevent problems later in the installation process. If your desired installation width has an EVEN
number of tiles you will need to start with a 36” wide kit. If your desired installation width has an
ODD number of tiles you will use 18” wide kits throughout.
AREA PREPARATION
Prepare the Floor
REQUIRED TOOLS & EQUIPMENT
FOUNDATION is designed for interior use.
We recommend you sweep the surface of dust
and debris before beginning.
Rubber mallet
Safety gloves
Power drill and 3/16” (5 mm) concrete bit (If
securing to floor)
REQUIRED
For safety and stability, parts
are designed to fit tight.
We suggest a mallet to tap parts into place and gloves
are always good practice when handling metal parts.
FOUNDATION PLATFORM 5”-12” (13 cm - 30 cm)
CLEANING, TOOLS & EQUIPMENT
Leg/Beam Assembly x 2
Leg Cross Brace x 2
Tiles x 4
FOUNDATION
®
PLATFORM
ASSEMBLY INSTRUCTIONS
Thank you for purchasing FOUNDATION
®
Modular Platform(s)
WHAT YOU’LL NEED
BEFORE YOU START!
For shipping purposes, the leg cross braces are assembled to be flush
with the leg/beam assembly. Separate the leg cross braces from the
leg/beam assembly and reattach them as they are displayed below.
Copyright © 2021 by Wearwell
®
LLC, 199 Threet Industrial Rd, Smyrna, TN 37167 • 800-264-3030 • www.wearwell.com
IFPL6
1
SEE THE
INSTALLATION VIDEO
TO LEARN MORE
VISIT US AT WEARWELL.COM/FOUNDATION
BEAM FEATURES