TO LEARN MORE
VISIT US AT WEARWELL.COM/FOUNDATION
TOE PLATE
Using a rubber mallet, insert the toe plate between the tile and the slot next
to the tile.
Ensure the toe plate side beam is secure along the length of the
FOUNDATION platform.
Pick each leg up and slide the bolt into the slot.
Starting at one end hold the toe plate, bolt and slide the bolt into the hole.
Hand tighten the nut onto the bolt.
Repeat with the remaining bolts.
Slide toe plate up to the top and tighten bolts.
Copyright © 2021 by Wearwell
®
LLC, 199 Threet Industrial Rd, Smyrna, TN 37167 • 800-264-3030 • www.wearwell.com
IFPL6
4
FOUNDATION
®
PLATFORM
ASSEMBLY INSTRUCTIONS
STEP 3
TOE PLATES
SIDE BEAM INSTALLATION
END PLATE INSTALLATION