
3) Pull the connecting cable through the pole. Put
the luminaire on top of the pole
D
and tighten
the fixing screws
E
, tightening to a torque of
5 Nm (44.3 in-lb).
Installation Procedure Pole Installation
Luminaire prewired, do not open!
1) Switch off the mains electrical supply.
2) Cut cable to the corresponding height of the
pole and connect cable to the connector
B
(
fig. 1-6
).
0-10V
Phase (L1) to 1, Neutral (N) to N, Control Phase
(+) to 2, Control Phase (–) to 3 and Earthing
For protection class II, the earthing is omitted.
Screw the gland nut together, tightening to a
torque of 5 Nm (44.3 in-lb) (
fig. 5)
.
WE-EF Eco Step Dim® Advanced / ON-OFF
R
J
P
O
Individual wiring
Through wiring
1-10V / DALI
R
J
O
P
Individual wiring
Through wiring
0-10 V
For ON/OFF