Phase One
Blockout Installation Procedure
(during earth or masonry work)
1) Ensure a suitable recess is provided to accommo-
date installation blockout/mounting ring assembly
L/H
.
2) Set installation blockout/mounting ring assembly
L/H
in position and ensure that:
a)Arrow
R
on mounting ring
H
is pointed towards
the object to be illuminated (wall, tree, column).
b)Mounting ring
H
is flush with surface
F
. If the
floor will be tiled or paved afterwards, leave an
appropriate gap.
c)Mains supply cable(s)
O
is of sufficient length to
connect sealable junction box
J
with cable
N
from
luminaire.
3) During ongoing earth and/or masonry works, do
not remove screws
M
from mounting ring
H.
Ensure that installation blockout/mounting ring
assembly
L/H
is not damaged and has maintained
its original shape. If necessary use a cover plate.
4