13
ETV100
BLOCKOUT INSTALLATION:
ATTENTION: PROVIDE PROPER DRAINAGE FOR APPLICATION, A
SOIL PERCOLATION TEST
SHOULD BE
PERFORMED TO DETERMINE IF PROPER DRAINAGE IS PRESENT.
1.
TAKE THE INSTALLATION COVER
A
OUT OF INSTALLATION BLOCKOUT
B
. LEAD THE CONNECTING CABLE
THROUGHT THE DRILLED HOLE IN SIDE OF BLOCKOUT.
2.
PLACE THE CABLE AT THE BOTTOM AREA OF THE BLOCKOUT, THEN REPLACE THE COVER
A
ONTO THE
BLOCKOUT
B
. THE BLOCKOUT NEEDS TO BE PLACED ON AN EVEN, STABLE AREA. THE TOP EDGE OF THE
BLOCKOUT SHOULD NE FLUSH WITH THE SURFACE.
ATTENTION: IF THE FLOOR WILL BE TILED OR PAVED AFTERWARDS, LEAVE AN APPROPRIATE GAP.
3.
IN CASE THE LUMINAIRE IS INSTALLED AT A LATER TIME, THE BLOCKOUT MUST BE COVERED BY INSTALLATION
COVER
A
, TO MAKE SURE NO CONCRETE OR DIRT MAY ENTER THE LUMINAIRE.
THE INSTALLATION COVER ENSURES THAT THE BLOCKOUT IS NOT DAMAGED DURING MASONRY WORK AND
NEEDS TO REMAIN INSIDE THE BLOCKOUT UNTIL INSTALLATION OF THE LUMINAIRE.
Summary of Contents for ETC130-GB-CC/TW
Page 1: ...1 WE EF LIGHTING USA LLC DMX LIGHTING USER MANUAL...
Page 5: ...5...
Page 16: ...16 FIXTURE WIRING POWER WIRING...
Page 17: ...17 DMX WIRING...
Page 18: ...18 DMX COLOR CODE...
Page 21: ...21 SYSTEM WIRING EXAMPLE...
Page 35: ...35 OPTICAL ACCESSORIES...