BLOCKOUT INSTALLATION:
ATTENTION: PROVIDE PROPER DRAINAGE FOR APPLICATION, A
SOIL PERCOLATION TEST
SHOULD BE
PERFORMED TO DETERMINE IF PROPER DRAINAGE IS PRESENT.
1.
PRIOR TO CONCRETE INSTALLATION, SET THE BLOCKOUT
E/O
IN AN ADEQUATE RECESS IN THE GROUND, ALONG
WITH THE POWER SUPPLY WIRING. THE MOUNTING RING
E
SHOULD BE SET FLUSH WITH THE FINISHED
PAVEMENT, BUT REMAIN AT A HIGHER ELEVATION THAN THE SURROUNDING AREA TO PREVENT WATER FROM
POOLING ON THE FIXTURE AFTER INSTALLATION IS COMPLETE. ARROW
R
SHOULD BE POINTED TOWARDS THE
OBJECT TO BE ILLUMINATED.