background image

Dosing Device Foamdos V6

 

 
 

Index:  00 

Date modified: 18/05/2021 

OI No.: BA DW 025-00 Foamdos V6 EN.DOCX 

Page 3 of 37

 

6.5.14

 

Contrast ................................................................................................................................................... 23

 

6.5.15

 

Language .................................................................................................................................................. 23

 

6.5.16

 

Info ........................................................................................................................................................... 23

 

6.5.17

 

Factory reset ............................................................................................................................................. 24

 

6.5.18

 

Password for user menu ........................................................................................................................... 24

 

6.5.19

 

Fault indications ........................................................................................................................................ 24

 

6.6

 

Adjust the foam consistency...................................................................................................................... 25

 

6.7

 

Replenish consumables ............................................................................................................................. 25

 

7

 

Maintenance, care, faults ....................................................................................................................... 26

 

7.1

 

Device maintenance .................................................................................................................................. 26

 

7.1.1

 

Check / change hose kit ........................................................................................................................... 26

 

7.1.2

 

Dosing valves, renew valve rubber ........................................................................................................... 27

 

7.2

 

Trouble-shooting ...................................................................................................................................... 28

 

8

 

Decommissioning – Storage – Disposal ................................................................................................. 29

 

8.1

 

General ..................................................................................................................................................... 29

 

8.2

 

Decommissioning ...................................................................................................................................... 29

 

9

 

Documents ............................................................................................................................................ 30

 

9.1

 

Declaration of conformity ......................................................................................................................... 30

 

9.2

 

Wiring Diagram ........................................................................................................................................ 31

 

9.3

 

Commissioning protocol / instruction ....................................................................................................... 32

 

9.4

 

Operation data sheet ................................................................................................................................ 33

 

9.5

 

Maintenance protocol ............................................................................................................................... 35

 

9.6

 

Spare parts list, wear parts list, list of consumables ................................................................................... 36

 

10

 

Appendices ............................................................................................................................................ 37

 

 

Imprint:  

All rights reserved 
© Copyright by WDT – Werner Dosiertechnik GmbH & Co KG, Edition: see footer 
Reproduction  of  any  kind  and  translation  into  other  languages,  even  in  excerpts,  are  only  permitted  with  the  express 

authorisation of the company WDT - Werner Dosiertechnik GmbH & Co. KG.  
These operating instructions are an English translation of the original German version by the company WDT. 
 
Responsible for the content:  

Co. WDT - Werner Dosiertechnik GmbH & Co. KG 
Hettlinger Str. 17, D-86637 Wertingen-Geratshofen 
Phone:+49 (0) 82 72 / 9 86 97 – 0, Fax:+49 (0) 82 72 / 9 86 97 – 19, Email: 

[email protected]

  

Summary of Contents for Foamdos V6

Page 1: ...Article no 27165 OI No BA DW 025 00 Foamdos V6 EN DOCX Language EN Operating Instructions Dosing Device Foamdos V6 Massage foam for hammam massages...

Page 2: ...n site 13 4 2 Installation instructions suggested installation 13 4 3 Mechanical installation 13 4 3 1 Install mounting plate with control unit 13 4 3 2 Install the button plate 13 4 4 Hydraulic insta...

Page 3: ...30 9 2 Wiring Diagram 31 9 3 Commissioning protocol instruction 32 9 4 Operation data sheet 33 9 5 Maintenance protocol 35 9 6 Spare parts list wear parts list list of consumables 36 10 Appendices 37...

Page 4: ...derstood these operating instructions Electrical connection work may only be carried out by appropriately trained specialists 1 3 Symbols used This document uses the following types of safety notices...

Page 5: ...r and tear For these we assume a warranty of 1 2 year Our merchandise management programme requires an invoice for each delivery including warranty services When returning a defective component upon r...

Page 6: ...protective clothing Observe the warning notices on the device 2 2 1 Handling of chemicals risks to humans and the environment Important information concerning the handling of chemicals and fragrances...

Page 7: ...natively Installation below the massage table Isolated ground socket recommended VDE B12 fuse Thermostatic mixer water connection mixed water 1 2 Required pressure at the transfer point min 1 5 bar fl...

Page 8: ...iping to foam dispenser 10 Dosing valve foam concentrate with hose line 11 Dosing valve air with hose line 12 Solenoid valve flushing 13 System separator with connection for drain d40mm 14 Connection...

Page 9: ...mp for damage according to the maintenance protocol or each time you refill the foam concentrate 3 2 2 Control unit The control unit consists of a housing with openings on the side for cooling the bui...

Page 10: ...delivery container the canister lid of the delivery container can be used 3 2 7 Drain valve accessory If the technical room is located on a floor below a drain valve solenoid valve can be installed t...

Page 11: ...30VAC 50Hz 150W safety plug Fuse F500 2A slow D8 3x8 on NT35 Nominal pressure house connection min 1 5barg max 8 barg Recommended operating pressure at the pressure reducer Max 4 barg Required duct co...

Page 12: ...only be transported and stored in its original packaging Please ensure careful handling For transport and storage purposes the roller carrier of the dosing pump is not mounted This prevents the hose...

Page 13: ...ation 4 3 1 Install mounting plate with control unit Install the FOAMDOS dosing device at working level in the technical room It is also possible to install the dosing device below the massage table 1...

Page 14: ...ice to the house water line This must be recorded by the installer in a handover protocol To prevent limescale deposits we generally recommend using softened water 4 German hardness Installation plan...

Page 15: ...l mounting bend 2 Foam line with drain valve If the foam line must be installed at an incline and exceeds a length of 1m the use of a drain valve accessory is recommended Install the foam line with br...

Page 16: ...discharge himself for at least 5 seconds For example by touching an earthed system part or by wearing an ESD antistatic wrist strap connected to an earth wire 4 5 1 Open close the housing The housing...

Page 17: ...re that the device has been correctly installed and connected 5 2 1 Prepare the foam concentrate 1 Place the canister with the foam concentrate under the device 2 Remove the canister lid 3 Place the s...

Page 18: ...the entire hose is contained in the casing Now replace the safety disc and the transparent pump cover This completes the installation of the roller carrier The dismantling of the roller carrier and t...

Page 19: ...rotating peristaltic pump Operation with the protective cover 31 removed is prohibited 6 2 Control unit Software The control unit is operated via the device s control unit display with 3 buttons The...

Page 20: ...imes for the foam time and flushing time Standby operational readiness If no input occurs for 60 seconds the backlighting is dimmed Standby mode Pressing a key ends the Standby mode 6 4 Button plate f...

Page 21: ...control in order to narrow down possible faults For test functions the time is set to 20 seconds and cannot be changed The test function can be prematurely cancelled with the Enter key 6 5 1 Foam tim...

Page 22: ...ontrol Start flushing with water Function The Flush solenoid valve opens The control LED on the solenoid valve lights up 6 5 7 Test SV foam Only for function control Open the Foam solenoid valve Funct...

Page 23: ...e accessory emptying foam line This menu only appears when Emptying foam line is activated see above Input of emptying time in seconds 6 5 13 Emptying type accessory emptying foam line This menu only...

Page 24: ...er menu The menus for the user can be protected with a password All menus that can be protected with a password are protected together The menus cannot be protected individually ON Protect menus with...

Page 25: ...am becomes more liquid 6 7 Replenish consumables Replace the canister with foam concentrate a Unscrew the lid of the new canister b Place the suction lance in the canister c Screw the suction lance s...

Page 26: ...ar cleaning of the device 2 Stocking of the consumables 3 Testing and maintenance in accordance with the maintenance protocol in Chapter 9 5 7 1 1 Check change hose kit The hose in the peristaltic pum...

Page 27: ...age the hose nipples 3 Push the new dosing hose onto the hose nipples so that the markings on the hose ends are located in the front This ensures that the hose is not twisted 4 Attach the hose ends us...

Page 28: ...supply Device not functioning Incorrect setting Fuse defective Control circuit board defective Check reset settings Renew fuse Renew circuit board Solenoid valve without function Fuse defective Solen...

Page 29: ...f in doubt information may be obtained from the institution responsible for disposal at your location If this is not possible dispose as hazardous waste 8 2 Decommissioning Switch off the device at th...

Page 30: ...Dosing Device Foamdos V6 Index 01 Date modified 30 08 2019 OI No BA DW 025 00 Foamdos V6 EN DOCX Page 30 of 37 9 Documents 9 1 Declaration of conformity...

Page 31: ...Foamdos V6 Index 01 Date modified 30 08 2019 OI No BA DW 025 00 Foamdos V6 EN DOCX Page 31 of 37 9 2 Wiring Diagram Notice for wiring diagrams The wiring diagrams can also be found near the device s c...

Page 32: ...V6 EN DOCX Page 32 of 37 9 3 Commissioning protocol instruction This protocol is to be completed by the commissioning technician Without a completed and signed commissioning protocol all warranty clai...

Page 33: ...s 20 s Emptying Yes No yes Empty time 3 s 0 30 s yes Empty type SV or compressor Contrast 8 0 15 yes Password protection for user menu ON ON OFF Sequence when switching on directly according to facto...

Page 34: ...pty type SV or compressor Contrast 8 0 15 yes Password protection for user menu ON ON OFF Sequence when switching on directly according to factory settings Operation data sheet master copy Parameter F...

Page 35: ...ied 30 08 2019 OI No BA DW 025 00 Foamdos V6 EN DOCX Page 35 of 37 9 5 Maintenance protocol Carry out the specified maintenance tasks in order to protect any warranty claims The maintenance protocol i...

Page 36: ...4259 Safety disc grey 13633 Hose kit 4 8x1 6 13414 Hose bracket with hose 4 8x1 6 12703 Suction set 12 12278 Dosing valve air 3 8 20503 Dosing valve foam concentrate 3 8 20502 Diaphragm pump 24269 Sol...

Page 37: ...Index 01 Date modified 30 08 2019 OI No BA DW 025 00 Foamdos V6 EN DOCX Page 37 of 37 10 Appendices Commissioning protocol Maintenance protocol Supplementary sheet BB DW 001 Installation flush mounte...

Page 38: ......

Page 39: ...ment 1 Commissioning 1 1 Device checked for correct installation 1 2 Commissioning conducted according to Operating Instructions Chapter 5 1 3 Thermostatic mixer option set 1 4 Control parameters adju...

Page 40: ......

Page 41: ...3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 Comment additional tasks 1 Water supply part 1 1 Check device for leaks 3 1 2 Activate valves check for function and leaks...

Page 42: ......

Page 43: ...recess to sink the sealing flange with a depth of 3mm Dimensions 1 fold HxW min 130x97mm 2 fold HxW min 163x97mm 3 fold HxW min 196x97mm 4 fold HxW min 229x97mm d Break out an orifice for the empty co...

Page 44: ...uilding foam in the wall approximately 20 mm protruding due to flush system Insert cable d Install the supplied construction protection cap in the flush mounted box e Plaster the brickwork so that the...

Reviews: