WCS Dumpster Assembly Instructions Manual Download Page 7

 

Version 6: June 6, 2019 

Waste Container Systems

 

 

Step 10

 – Take off left and right front hinge nuts only leave bolt in place. 

Install front panel

 by placing inside front 

bottom rail of frame and over the hinge bolts. Replace hinge nuts 

Finger Tighten Only

 

 

 

 

 

 

 

 

 

 

 

Step 11

 - Attach left and right support rails to front rail forming a letter 

“V”

 using 4 bolts/nuts. 

Finger tighten only. 

Make sure that bag support rod holes are facing up. Finger Tighten Only. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step 12

 - Install bag protection shields. Left and right front top corners. Bolts go through bag protection shields, corner 

post, and front panel. Attach nuts. 

Finger tighten only.

 These secure front panel. Tighten all 10 bolts securing front of 

dumpster components.  

 

Step 13

 - Attach end bag support rails for bags to each front corner post. Rails go inside of corner posts. 

Finger Tighten 

Only. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Bag Support 

Rod Holes  

Remove nut only and 

place the front panel 

over the hinge bolts to 

secure it to the frame.  

Front view location of hinge bolt.  

Summary of Contents for Dumpster

Page 1: ...ientation of Dumpster Front is determined by the locking left front wheel and the two corner posts are shorter than the back Parts List Parts Packed in Dumpster 2 bag support rods 1 lid support rod 1 left front vertical support 1 right front vertical support 1 back center vertical support 2 end bag support rails 2 bag protectors 1 Front panel 2 Lids Hardware Bag 2 left and right lid brackets Shown...

Page 2: ...tems Main Part Locations Bag Protection Panel Front Bag Support Rod Corner Stacking Bracket Front Panel Figure 1 Left Rear Detail Center Rear Detail Lid Support Rod Left Rear Lid Bracket Bag Support Rod Middle Rear Lid Bracket Figure 2 Figure 3 ...

Page 3: ...stacking or moving They secure the fork pockets Step 3 Remove the two bolts holding each of the corner stacking brackets in place The bolts will be put back on to secure the end sections and corner brackets to the frame when ends are raised vertically Front Top Rail two bolt holes in center Back Top Rail one hole in center Rear Corner Bolt Rear Corner Bolt Step 2 Remove front and rear center trans...

Page 4: ...r the other end End units are heavy and should always be secured with at least one bolt before letting go If not the end could fall and cause injury Step 5 Remove the front panel that is laying flat and covering the remaining parts Remove all parts from bottom of dumpster until you are left with the mesh bottom Note Check bolts holding casters as they may have loosened during transport End unit an...

Page 5: ...haped bottom support rails under mesh bottom using 4 bolts and nuts and tighten Notice that the sides of the rails forming the L face the end of the unit Bottom support rails installed bottom view End of Unit End of Unit Bottom support rails installed top view Figure 8 ...

Page 6: ...8 With top rear rail in place insert middle back support rail vertically between top and bottom rails with the bag support rod hole at the top When connecting support rail to top piece place middle lid support bracket on top rail and insert bolt through this bracket the top rail and the vertical support rail Note Middle lid support bracket should be flush with the top of the top rail Step 9 Instal...

Page 7: ...t bag support rod holes are facing up Finger Tighten Only Step 12 Install bag protection shields Left and right front top corners Bolts go through bag protection shields corner post and front panel Attach nuts Finger tighten only These secure front panel Tighten all 10 bolts securing front of dumpster components Step 13 Attach end bag support rails for bags to each front corner post Rails go insid...

Page 8: ...end Step 16 Insert rear bag support rod from left or right rear post through the end bag rail bag sleeve and center vertical support rail to opposite corner end bag support rail Insert cotter pin in each end of rod to secure Note Insert Cotter Pins in the Ends of All Support Rods to Secure Front of bag has three flaps Bag support rod must go through the hole at top of vertical support rail ...

Page 9: ...rt rail to secure Step 19 Tie bag to frame and mesh bottom Use all ties These photos of the left middle and right top back of the dumpster show the lid support rod going through the corner bracket first lid middle bracket second lid and opposite bracket These photos show the left center and right front of the dumpster with bag Notice that the bag folds over the top rail and then the support rod is...

Page 10: ...10 Version 6 June 6 2019 Waste Container Systems Questions Email jon huber wastecontainersystems com Assembled Dumpster Stacked on Two Unassembled ...

Reviews: