![WCS Dumpster Assembly Instructions Manual Download Page 6](http://html1.mh-extra.com/html/wcs/dumpster/dumpster_assembly-instructions-manual_878951006.webp)
6
Version 6: June 6, 2019
Step 7
-
Install back top rail using 2 end lid brackets from parts bag on back side of the unit. Corner posts are taller for
the back side.
Finger Tighten Only.
Note: There is only one hole in the middle of the back, top rail.
*If only one person is doing the assembly, follow step
“
a”
below.
a.
Attach one end with one bolt/nut loosely. Raise rail and attach the other end.
With both ends attached,
tighter the 4 bolts on each end
making sure that the
lid support brackets are level
with the
top of the corner posts as shown in photos. .
Step 8
– With top, rear rail in place, insert middle back support rail vertically between top and bottom rails with the bag
support rod hole at the top. When connecting support rail to top piece, place middle lid support bracket on top rail and
insert bolt through this bracket, the top rail, and the vertical support rail. Note: Middle lid support bracket should be
flush with the top of the top rail.
Step 9
-
Install front top rail on front of unit using the top and bottom of the three holes in corner of top rail – corner
posts are shorter than rear of unit. 2 bolts each side.
Tighten all four corner bolts making sure that the rail is level with
the top of the corner posts. Note – Front top rail has two holes in the middle.
Middle Lid Support Bracket
Top holes point up.
Bag Support
Rod Hole