WCS Dumpster Assembly Instructions Manual Download Page 6

 

Version 6: June 6, 2019 

Waste Container Systems

 

 

Step 7

 - 

Install back top rail using 2 end lid brackets from parts bag on back side of the unit. Corner posts are taller for 

the back side. 

Finger Tighten Only.

 Note: There is only one hole in the middle of the back, top rail.  

*If only one person is doing the assembly, follow step 

a”

 below.  

 

a.

 

Attach one end with one bolt/nut loosely. Raise rail and attach the other end.  

 

With both ends attached, 

tighter the 4 bolts on each end

 making sure that the 

lid support brackets are level

 with the 

top of the corner posts as shown in photos. .  

 

 

 

 

 

 

 

 

 

Step 8

 – With top, rear rail in place, insert middle back support rail vertically between top and bottom rails with the bag 

support rod hole at the top. When connecting support rail to top piece, place middle lid support bracket on top rail and 

insert bolt through this bracket, the top rail, and the vertical support rail. Note: Middle lid support bracket should be 

flush with the top of the top rail. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Step 9

 - 

Install front top rail on front of unit using the top and bottom of the three holes in corner of top rail – corner 

posts are shorter than rear of unit. 2 bolts each side. 

Tighten all four corner bolts making sure that the rail is level with 

the top of the corner posts. Note – Front top rail has two holes in the middle.  

 

 

 

 

 

Middle Lid Support Bracket 

Top holes point up. 

Bag Support 

Rod Hole 

Summary of Contents for Dumpster

Page 1: ...ientation of Dumpster Front is determined by the locking left front wheel and the two corner posts are shorter than the back Parts List Parts Packed in Dumpster 2 bag support rods 1 lid support rod 1 left front vertical support 1 right front vertical support 1 back center vertical support 2 end bag support rails 2 bag protectors 1 Front panel 2 Lids Hardware Bag 2 left and right lid brackets Shown...

Page 2: ...tems Main Part Locations Bag Protection Panel Front Bag Support Rod Corner Stacking Bracket Front Panel Figure 1 Left Rear Detail Center Rear Detail Lid Support Rod Left Rear Lid Bracket Bag Support Rod Middle Rear Lid Bracket Figure 2 Figure 3 ...

Page 3: ...stacking or moving They secure the fork pockets Step 3 Remove the two bolts holding each of the corner stacking brackets in place The bolts will be put back on to secure the end sections and corner brackets to the frame when ends are raised vertically Front Top Rail two bolt holes in center Back Top Rail one hole in center Rear Corner Bolt Rear Corner Bolt Step 2 Remove front and rear center trans...

Page 4: ...r the other end End units are heavy and should always be secured with at least one bolt before letting go If not the end could fall and cause injury Step 5 Remove the front panel that is laying flat and covering the remaining parts Remove all parts from bottom of dumpster until you are left with the mesh bottom Note Check bolts holding casters as they may have loosened during transport End unit an...

Page 5: ...haped bottom support rails under mesh bottom using 4 bolts and nuts and tighten Notice that the sides of the rails forming the L face the end of the unit Bottom support rails installed bottom view End of Unit End of Unit Bottom support rails installed top view Figure 8 ...

Page 6: ...8 With top rear rail in place insert middle back support rail vertically between top and bottom rails with the bag support rod hole at the top When connecting support rail to top piece place middle lid support bracket on top rail and insert bolt through this bracket the top rail and the vertical support rail Note Middle lid support bracket should be flush with the top of the top rail Step 9 Instal...

Page 7: ...t bag support rod holes are facing up Finger Tighten Only Step 12 Install bag protection shields Left and right front top corners Bolts go through bag protection shields corner post and front panel Attach nuts Finger tighten only These secure front panel Tighten all 10 bolts securing front of dumpster components Step 13 Attach end bag support rails for bags to each front corner post Rails go insid...

Page 8: ...end Step 16 Insert rear bag support rod from left or right rear post through the end bag rail bag sleeve and center vertical support rail to opposite corner end bag support rail Insert cotter pin in each end of rod to secure Note Insert Cotter Pins in the Ends of All Support Rods to Secure Front of bag has three flaps Bag support rod must go through the hole at top of vertical support rail ...

Page 9: ...rt rail to secure Step 19 Tie bag to frame and mesh bottom Use all ties These photos of the left middle and right top back of the dumpster show the lid support rod going through the corner bracket first lid middle bracket second lid and opposite bracket These photos show the left center and right front of the dumpster with bag Notice that the bag folds over the top rail and then the support rod is...

Page 10: ...10 Version 6 June 6 2019 Waste Container Systems Questions Email jon huber wastecontainersystems com Assembled Dumpster Stacked on Two Unassembled ...

Reviews: