
V. Installation
Watch This Video Instruction Before Use
Step1: Align the steel pipes with the grooves of the black bases, fix
them to the towel rack by screws.
Tips: The steel pipes with U
-
Shaped groove and black base with two pilot holes are installed on
the position with the wire.
Step2: Draw the drilling points for the 4 silver bases.
Tips: Install the silver base with 3 pilot holes on the position of the wire and fix it to the wall
with two screws.
Step3: Drill out 5 pilot holes with the depth of 1.57'' and the diameter
of 5⁄16''.
Step4: Install the expansible rubbers to the hole.
Step5: Align the silver base and fix it to the wall with screw.
Step6: Install the towel rack to the silver bases on the wall and fix them
with the hexagon socket screws.