background image

 

         www.wave-2-wave.com 

DOC -0001   

Hardware 

Installation Manual

Page 9

Preparing ROME

3.1  

Installation Preparation

Before beginning the installation of ROME equipment, please make sure to:

 

•    Wear an ESD strap.

•    Have a mechanical lifting device available, such as the one pictured, which is required to lift   
      and maneuver the heavy, 87 kg (191.8lbs) ROME equipment, to avoid possible bodily injury.

  

•    For reference, have the completed Pre-Deployment Checklist on hand.

Summary of Contents for Rome500

Page 1: ...DOC 0001 Copyright 2017 Wave2Wave All rights reserved Hardware Installation Manual ...

Page 2: ...perty of their respective owners The use of the word partner does not imply a partnership relationship between Wave2Wave and any other company The limited warranty for the accompanying product is set forth in the Wave2Wave ROME product warranty and is incorporated herein by this reference If you are unable to locate the limited warranty contact your Wave2Wave Solution representative for a copy Cop...

Page 3: ...s 7 3 Preparing ROME 9 3 1 Installation Preparation 9 3 2 Unpacking ROME 10 4 Installing the ROME Chassis 11 4 1 Mounting the ROME Chassis 11 4 2 Mounting the Patch Panel 12 4 3 Cabling Fiber and Ground 13 5 Installing the LCU 14 5 1 Mounting the LCU 14 5 2 Connecting Cables Signaling and Ground 14 5 3 Powering Up ROME 16 Appendices 17 1 ROME Dimensions 17 2 LCU Dimensions 18 3 Patch Panel Dimensi...

Page 4: ...k Certification To ensure safety all configurations of the rack cabinet must be certified by a nationally recognized testing laboratory in order to verify compliance with country specific safety regulations This process ensures that the end product remains safe for the operator and service personnel under normal and foreseeable misuse conditions Heavy Equipment Due to the heavy 165 lbs 75 kg weigh...

Page 5: ...on must always be made first and disconnected last Avoiding Circuit Overload Overloading a circuit is potentially a fire hazard and a shock hazard under certain conditions To avoid these hazards 1 Take care when connecting units to the supply circuit so that wiring is not overloaded 2 Ensure that your system s electrical requirements do not exceed the branch circuit protections requirements Refer ...

Page 6: ...tool Jig to ensure proper assembly 2 1 Parts List 2 Slider Mounting Units 4 ROME Positioning Rulers 2 each for WECO and EIA racks 1 Clearance Level Testing Tool Jig 1 Cantilever tray for rear LCU support Note Each slider mounting unit is comprised of a rear bracket front bracket stiffener slider 6 socket head cap screws Each mounting unit comes pre assembled but with loose screws to allow for adju...

Page 7: ...ME chassis 2 3 Installing Slider Mounting Units Follow the steps below to install the ROME slider mounting units on a four post rack Prior to continuing please make absolutely sure that the safety guidelines from section 1 3 2 Heavy Equipment have been followed correctly 1 Place the ROME positioning ruler on the rack rail The lower end of the ruler should be 12 inches from the rack floor It is rec...

Page 8: ...y out through the front of the rack Use the jig by placing it on the 2 extended slider arms a Check right to left leveling using a level adjust sliders front brackets as needed b Run the jig between the 2 sliders from the front of the rack to the back to check for clearance c When the jig is in the back check the level again Adjust back screws if needed 7 Installing additional set of sliders if ap...

Page 9: ...nning the installation of ROME equipment please make sure to Wear an ESD strap Have a mechanical lifting device available such as the one pictured which is required to lift and maneuver the heavy 87 kg 191 8lbs ROME equipment to avoid possible bodily injury For reference have the completed Pre Deployment Checklist on hand ...

Page 10: ...indicators on the outside of the package and make sure they re not activated red If either indicator is red stop the process and contact Wave2Wave 4 After the crate is unpacked inspect the internal shock watch indicator and all elements of the unit for damage If either the indicator is activated or if there is any damage to the ROME equipment please do not proceed with installation and contact Wav...

Page 11: ...rocess 1 Move the ROME Chassis to the lift 2 Position the ROME unit with the front panel on the inner side of the lift front panel facing the lift mechanism 3 Route the patch panel through the rack and leave it on the other side of the rack 4 Extend slide out the sliders arms to maximum extension 5 Raise the ROME carefully and place it at the appropriate height in between the sliders 6 Align the e...

Page 12: ...he ROME to the front rack with the provided L brackets 4 2 Mounting the Patch Panel Sufficient cable length is provided to mount the patch panel in the front or rear of the four post rack Once the ROME Chassis has been fully installed in the rack the patch panel can be secured to the rack The patch panel is pre connected to ROME with a fiber cable and can be secured to the rack either before or af...

Page 13: ...wed to fully extend the ROME chassis outwards for maintenance 4 3 2 Grounding the ROME Chassis Connect the customer facility ground to the ROME Chassis at the attachment point which is located at the lower left corner when looking at the back of the ROME refer to the pictures below Verify that the ground cables wires are made of copper and that the facility ground cable is at least 10 AWG Rear Gro...

Page 14: ...install the LCU mount the cantilever tray on the rear of the four post rack Slide the LCU into the tray and attach the LCU to the front of the rack The LCU should be installed on top of the ROME chassis 5 2 Connecting Cables Signaling and Grounding 5 2 1 Connecting the Signaling Y Cables To connect the LCU to the ROME Chassis the following steps should be taken 1 Connect the provided LCU to the RO...

Page 15: ...5 2 2 Grounding the LCU Connect the customer facility ground to the ROME LCU at the attachment point which is located at the left corner when looking at the back of the ROME LCU refer to the picture below LCU Ground 2 Hole Compression Lug attached using M5 16mm screws ...

Page 16: ... the system s functional status Connect power to the LCU front panel power supply After power is connected to the first power supply the ROME chassis will automatically start up and go through an initial set up Once ROME has successfully powered on all three LEDs will begin blinking The hardware installation is now complete The next step is to configure the ROME software and ROME users which is co...

Page 17: ... DATE SIGNATURE NAME UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN MILLIMETERS SURFACE FINISH TOLERANCES LINEAR ANGULAR Q A MFG APPV D CHK D DRAWNYONATAN ROME Side View Dimensional Details mm 30 32in 770mm 31 14in 791mm 0 2in 5mm 0 63in 16mm 5 4 6 7 8 A REVISION DO NOT SCALE DRAWING DEBUR AND BREAK SHARP EDGES UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN MILLIMETERS SURFACE FINISH TOLERANCES LINEAR...

Page 18: ...n 430mm 28 16in 715 2mm 27 49in 698 2mm 17 48in 444 in 16 93in 430mm 17 44in 443mm 1 73in 44mm G 29 39in 745 5mm 16 93in 430mm 28 16in 715 2mm 27 49in 698 2mm 17 48in 444 in 16 93in 430mm 17 44in 443mm 1 73in 44mm G 29 39in 745 5mm 16 93in 430mm 28 16in 715 2mm 27 49in 698 2mm 17 48in 444 in 16 93in 430mm 17 44in 443mm 1 73in 44mm G 29 39in 745 5mm 16 93in 430mm Top View Rear View Side View Front ...

Page 19: ...6 05in 153 6mm 4 98in 126 6mm Appendix 3 Patch Panel Dimensions Appendix 4 Console Cable Pinout Signals and Pinouts for the Console RJ 45 to DB 9 Serial Cable Console Cable Pinout Console Port PC COM Port RJ 45 DB 9 Pins Signals Pins Signals 1 2 3 4 GND GND 5 TXD_RS232 3 RXD_RS232 6 RXD_RS232 2 TXD_RS232 7 8 ...

Page 20: ...t ROME Chassis powered by LCU Environmental Conditions Temperature Range operating 0 C to 40 C 32 F to 104 F Temperature Range storage 40 C to 70 C 40 F to 158 F Relative Humidity non condensing 5 to 95 Chassis Physical Characteristics Required Rack Space 10RU Ground Clearance Minimum 12 305mm from Rack Floor to Bottom of the ROME Front Clearance Minimum 30 762mm from Front of Rack Dimensions 17 4...

Page 21: ...been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manua...

Page 22: ...KXN4 Ireland phone 353 87 2610420 U S Headquarters 517 Fairview Way Milpitas CA 95035 phone 1 408 586 8800 email service service wave 2 wave com general inquiries info wave 2 wave com Contact Solutions Innovate Design Manufacture SF Bay Area Dublin Shenzhen Tel Aviv Hong Kong ...

Reviews: